Energía Solar en México – EMMI https://emmi.mx Infraestructura sustentable Thu, 01 Oct 2026 17:59:58 +0000 es hourly 1 https://wordpress.org/?v=7.1.2 https://emmi.mx/wp-content/uploads/2026/01/cropped-Sin-titulo-500-x-500-px-3-32x32.png Energía Solar en México – EMMI https://emmi.mx 32 32 Comparativo de financiamiento: CAPEX vs. PPA vs. Leasing https://emmi.mx/blog/comparativo-financiamiento-capex-ppa-leasing?utm_source=rss&utm_medium=rss&utm_campaign=comparativo-financiamiento-capex-ppa-leasing Thu, 01 Oct 2026 17:59:56 +0000 https://emmi.mx/?p=18232 .emmi-art, .emmi-art * { font-family: 'Open Sans', Arial, sans-serif; } .emmi-art p { margin: 0 0 20px; line-height:1.6; } .emmi-art h2.wp-block-heading { margin: 40px 0 18px; } .emmi-art h3.wp-block-heading { margin: 28px 0 14px; } .emmi-art .value-cta{ display:flex; background:#F7F7F7; border-radius:12px; overflow:hidden; margin:24px 0 32px; } .emmi-art .value-cta-img{ flex:0 0 200px; background-size:cover; background-position:center; } .emmi-art .value-cta-body{ flex:1; padding:24px 28px; display:flex; flex-direction:column; justify-content:center; gap:10px; } .emmi-art .value-cta-body p{ margin:0; font-size:14.5px; color:#4D4D4A; line-height:1.5; } .emmi-art .value-cta-body a{ align-self:flex-start; background:#004E74; color:#FFFFFF; text-decoration:none; font-size:13.5px; font-weight:700; padding:10px 20px; border-radius:8px; } .emmi-art .value-cta-body a:hover{ background:#003654; } @media (max-width:600px){ .emmi-art .value-cta{ flex-direction:column; } .emmi-art .value-cta-img{ flex:0 0 160px; width:100%; } } .emmi-art .reg-table-wrap{ border-radius:12px; overflow:hidden; border:1px solid #EDEDED; margin:24px 0 32px; } .emmi-art .reg-table{ width:100%; border-collapse:collapse; } .emmi-art .reg-table thead tr{ background:#004E74; } .emmi-art .reg-table th{ text-align:left; padding:14px 16px; color:#FFFFFF; font-size:13px; font-weight:700; } .emmi-art .reg-table td{ padding:12px 16px; font-size:13.5px; color:#4D4D4A; border-bottom:1px solid #EDEDED; } .emmi-art .reg-table tbody tr:nth-child(odd){ background:#FFFFFF; } .emmi-art .reg-table tbody tr:nth-child(even){ background:#F7F7F7; } .emmi-art .reg-table tbody tr:last-child td{ border-bottom:none; } .emmi-art .reg-table td.reg-name{ color:#004E74; font-weight:700; } @media (max-width:680px){ .emmi-art .reg-table-wrap{ overflow-x:auto; } .emmi-art .reg-table{ min-width:480px; } } .emmi-art .model-grid{ display:grid; grid-template-columns:repeat(3,1fr); gap:12px; margin:24px 0 32px; } .emmi-art .model-card{ background:#FFFFFF; border:1px solid #EDEDED; border-radius:12px; padding:18px; } .emmi-art .model-icon{ width:36px; height:36px; border-radius:50%; background:#EAF3DE; display:flex; align-items:center; justify-content:center; margin-bottom:12px; } .emmi-art .model-title{ font-size:13.5px; font-weight:700; color:#004E74; margin-bottom:6px; } .emmi-art .model-text{ font-size:12px; color:#4D4D4A; line-height:1.5; } @media (max-width:600px){ .emmi-art .model-grid{ grid-template-columns:1fr; } } .emmi-art .lease-grid{ display:grid; grid-template-columns:1fr 1fr; gap:12px; margin:24px 0 32px; } .emmi-art .lease-card{ border-radius:12px; padding:18px; } .emmi-art .lease-card.puro{ background:#EAF3DE; } .emmi-art .lease-card.financiero{ background:#F7F7F7; } .emmi-art .lease-label{ font-size:11px; font-weight:700; text-transform:uppercase; letter-spacing:0.03em; margin-bottom:8px; } .emmi-art .lease-card.puro .lease-label{ color:#206F28; } .emmi-art .lease-card.financiero .lease-label{ color:#98989A; } .emmi-art .lease-text{ font-size:12.5px; color:#4D4D4A; line-height:1.5; } @media (max-width:600px){ .emmi-art .lease-grid{ grid-template-columns:1fr; } } .emmi-art .nif-callout{ background:#004E74; border-radius:12px; padding:20px; margin:24px 0 32px; display:flex; gap:16px; align-items:center; } .emmi-art .nif-icon{ flex-shrink:0; width:40px; height:40px; border-radius:50%; background:rgba(255,255,255,0.15); display:flex; align-items:center; justify-content:center; } .emmi-art .nif-text{ font-size:13.5px; color:#FFFFFF; line-height:1.5; } .emmi-art .nif-text strong{ color:#92C83E; } .emmi-art .faq-block{ margin:24px 0 32px; } .emmi-art .faq-block details{ border-bottom:1px solid #EDEDED; list-style:none; } .emmi-art .faq-block details::marker, .emmi-art .faq-block details::-webkit-details-marker{ display:none; content:""; } .emmi-art .faq-block summary{ font-size:16px; font-weight:700; color:#004E74; cursor:pointer; list-style:none; display:flex; justify-content:space-between; align-items:center; padding:16px 0; } .emmi-art .faq-block summary::marker, .emmi-art .faq-block summary::-webkit-details-marker{ display:none; content:""; } .emmi-art .faq-block summary::after{ content:"+"; font-size:20px; color:#92C83E; font-weight:400; margin-left:12px; flex-shrink:0; } .emmi-art .faq-block details[open] summary::after{ content:"\2013"; } .emmi-art .faq-block details p{ margin:0 0 16px; font-size:14.5px; color:#4D4D4A; line-height:1.6; } .emmi-art .cta-final{ background-image:linear-gradient(rgba(0,78,116,0.88), rgba(0,78,116,0.88)), url('https://emmi.mx/wp-content/uploads/2024/10/DRON-1-1.webp'); background-size:cover; background-position:center; border-radius:16px; padding:36px 32px; text-align:center; margin:24px 0 32px; } .emmi-art .cta-final img{ height:32px; margin-bottom:18px; } .emmi-art .cta-final p{ color:#FFFFFF; font-size:16px; margin:0 0 20px; max-width:480px; margin-left:auto; margin-right:auto; line-height:1.5; } .emmi-art .cta-final a{ display:inline-block; background:#92C83E; color:#004E74; font-weight:700; padding:14px 28px; border-radius:8px; text-decoration:none; } .emmi-art .cta-final a:hover{ background:#206F28; }
Esta guía compara los tres modelos con los que una empresa industrial puede financiar su proyecto: compra directa (CAPEX), contrato de compra de energía (PPA) y arrendamiento.

Una forma sencilla de entender los tres modelos

CAPEX
Compras el sistema con recursos propios o crédito. Es tuyo desde el primer día y eres propietario desde la instalación.
PPA
Un tercero invierte en el sistema y tú pagas solo por la energía que consumes, a un precio fijo acordado desde el inicio, normalmente menor al de tu recibo de CFE.
Leasing
Rentas el equipo con pagos fijos, sin invertir capital por adelantado. Por ejemplo, pagas una renta mensual fija, de forma similar a rentar un vehículo o maquinaria industrial.

¿Qué implica financiar tu sistema con CAPEX?

Con CAPEX, tu empresa compra el sistema solar con recursos propios o mediante crédito bancario. El equipo es tuyo desde el primer día, y accedes al beneficio fiscal completo del artículo 34 de la LISR desde el primer año. Con EMMI, la operación y el mantenimiento del sistema se incluyen durante el primer año.

El beneficio fiscal aquí es directo: el artículo 34, fracción XIII de la Ley del Impuesto Sobre la Renta permite deducir el 100% de la inversión en equipo de generación renovable en el mismo ejercicio fiscal, en vez de repartirla en varios años.

Instalar paneles solares reduce hasta 30% tu pago de ISR: te explicamos cómo funciona esta deducción y cuánto podrías ahorrar en un ejercicio hipotético.

Leer artículo completo

¿Qué implica un contrato PPA?

En un PPA (Power Purchase Agreement), un tercero, en este caso EMMI, invierte en el diseño, la instalación y la operación del sistema. Tu empresa no desembolsa capital: paga mensualmente por la energía que el sistema genera, a un precio acordado desde el inicio del contrato.

El sistema no aparece como un activo en tu balance mientras dura el contrato, porque el contrato corresponde a la compra de la energía que produce, no a la compra del equipo. El riesgo tecnológico y el mantenimiento quedan del lado del proveedor. En el modelo que EMMI ofrece, el activo puede transferirse a tu empresa al finalizar el contrato, según lo que se acuerde en la negociación.

¿Qué implica rentar el sistema con leasing?

Aquí es donde más se presta a confusión: “leasing” se divide fiscalmente en dos figuras distintas, con tratamientos muy diferentes.

Arrendamiento puro
Sin obligación de comprar al final del contrato. Para maquinaria industrial, la renta se deduce al 100% conforme se paga, sin el tope que sí aplica a la renta de automóviles bajo el artículo 28 de la LISR.
Arrendamiento financiero
Incluye opción de compra, prórroga del plazo o participación en la venta a un tercero. Se trata como una compra: solo los intereses se deducen, y el equipo se deprecia según el artículo 38 de la LISR.

Si el contrato incluye una cláusula que te obliga a comprar el equipo al finalizar, el SAT lo reclasifica como arrendamiento financiero, aunque se le haya llamado “leasing” en el papel. El modelo de arrendamiento puro que ofrece EMMI evita justamente esa reclasificación.

¿Cómo se refleja esto en tu balance?

El tratamiento contable depende de una norma distinta a la fiscal. La NIF D-5, la norma contable mexicana vigente desde 2019 y alineada con el estándar internacional IFRS 16, establece que tu empresa debe reconocer en el balance un activo por derecho de uso y un pasivo por arrendamiento para prácticamente todos los contratos de arrendamiento, con pocas excepciones (contratos de corto plazo o de bajo valor). Esto aplica tanto al arrendamiento puro como al financiero, aunque fiscalmente se traten distinto ante el SAT.

Bajo la NIF D-5 (vigente desde 2019), casi todo arrendamiento genera un activo por derecho de uso y un pasivo por arrendamiento en tu balance.

Un PPA, en cambio, generalmente sí se mantiene fuera de este tratamiento, porque no transfiere el control de un activo específico identificado, solo la compra de la energía que produce.

La distinción entre el tratamiento fiscal (ante el SAT) y el tratamiento contable (en tu balance, ante la NIF D-5) vale la pena validarla con tu equipo contable antes de firmar cualquier contrato.

Comparativo completo

CriterioCAPEXPPALeasing (arrendamiento puro)
Inversión inicialAltaCeroCero o baja
Propietario del sistemaTu empresa desde el día unoEl proveedor durante el contratoEl proveedor durante el contrato
Deducción fiscal100% en el primer año (Art. 34 LISR)No aplica (es un gasto operativo)100% de la renta, sin tope, mientras se paga
Aparece en tu balanceSí, como activo fijoGeneralmente noSí, como activo por derecho de uso (NIF D-5)
Riesgo tecnológicoDe tu empresaDel proveedorDel proveedor
MantenimientoDe tu empresa (o contratado aparte)IncluidoIncluido
Velocidad de implementaciónDepende de tu proceso interno de aprobaciónMás rápida, es un gasto operativoRápida, sin desembolso que aprobar

¿Cuál modelo conviene según el perfil de tu empresa?

No existe una respuesta única, porque cada modelo resuelve una prioridad distinta:

  • CAPEX conviene si tu empresa tiene capital disponible, planea permanecer en el inmueble a largo plazo, y quiere maximizar el retorno total del proyecto, incluyendo el beneficio fiscal completo del primer año.
  • PPA conviene si priorizas la liquidez, no quieres que el proyecto compita con otras inversiones dentro de tu presupuesto de capital, o si el inmueble no es propio.
  • Leasing conviene si buscas una renta predecible sin desembolso inicial, y tu prioridad es la deducción fiscal inmediata de la renta más que la propiedad del equipo desde el inicio.

Puerto Libertad: la planta fotovoltaica de 405 MW en el desierto de Sonora. En EMMI ejecutamos el montaje mecánico, eléctrico y civil de 180 MW dentro de esta planta, una de las más grandes de Latinoamérica. Conoce los detalles del proyecto.

Leer artículo completo

Preguntas frecuentes

¿El leasing de un sistema solar aparece en el balance de mi empresa?

Sí. Bajo la NIF D-5, vigente en México desde 2019, la mayoría de los contratos de arrendamiento generan un activo por derecho de uso y un pasivo en el balance, sin importar si el arrendamiento es puro o financiero.

¿Cuál es la diferencia entre arrendamiento puro y arrendamiento financiero?

El arrendamiento puro no obliga a comprar el equipo al final del contrato, y su renta se deduce al 100% mientras se paga. El arrendamiento financiero incluye una opción de compra u otras cláusulas similares, y fiscalmente se trata como una compra: solo los intereses se deducen, y el equipo se deprecia como activo.

¿La NIF D-5 puede afectar mis covenants bancarios con otros créditos?

Sí. Al reconocer un pasivo por arrendamiento en el balance, tus indicadores de apalancamiento cambian, lo que puede requerir renegociar covenants definidos con base en deuda financiera, especialmente si el contrato de crédito no distingue entre deuda bancaria y pasivo por arrendamiento.

¿Elegir CAPEX o leasing en vez de PPA reduce mi capacidad de endeudamiento para otros proyectos?

Puede hacerlo. Tanto el CAPEX como el leasing agregan un activo y, en el caso del leasing, también un pasivo a tu balance, lo que afecta tus razones financieras. Un PPA generalmente no tiene ese efecto, ya que no se reconoce como un activo o pasivo propio de tu empresa.

¿Cuál de los tres modelos ofrece EMMI?

Los tres: compra directa (CAPEX) con beneficios de depreciación fiscal, arrendamiento puro con renta mensual fija, y PPA donde EMMI invierte en el proyecto y el activo puede transferirse a tu empresa al finalizar el contrato.

EMMI

Agenda un estudio técnico-económico con EMMI y descubre qué modelo de financiamiento, CAPEX, PPA o leasing, conviene más a la situación financiera de tu empresa.

Agenda tu estudio aquí
]]>
Checklist: ¿Cómo elegir un buen proveedor de paneles solares? https://emmi.mx/blog/checklist-elegir-proveedor-paneles-solares?utm_source=rss&utm_medium=rss&utm_campaign=checklist-elegir-proveedor-paneles-solares Tue, 29 Sep 2026 19:58:35 +0000 https://emmi.mx/?p=18200 .emmi-art, .emmi-art * { font-family: 'Open Sans', Arial, sans-serif; } .emmi-art p { margin: 0 0 20px; line-height:1.6; } .emmi-art h2.wp-block-heading { margin: 40px 0 18px; } .emmi-art h3.wp-block-heading { margin: 28px 0 14px; } .emmi-art ul.wp-block-list, .emmi-art ol.wp-block-list{ margin:0 0 20px; padding-left:22px; } .emmi-art ul.wp-block-list li, .emmi-art ol.wp-block-list li{ margin-bottom:8px; line-height:1.55; } .emmi-art .value-cta{ display:flex; background:#F7F7F7; border-radius:12px; overflow:hidden; margin:24px 0 32px; } .emmi-art .value-cta-img{ flex:0 0 200px; background-size:cover; background-position:center; } .emmi-art .value-cta-body{ flex:1; padding:24px 28px; display:flex; flex-direction:column; justify-content:center; gap:10px; } .emmi-art .value-cta-kicker{ display:inline-block; align-self:flex-start; background:#EAF3DE; color:#206F28; font-size:11px; font-weight:700; text-transform:uppercase; letter-spacing:0.03em; padding:4px 10px; border-radius:999px; margin-bottom:2px; } .emmi-art .value-cta-body p{ margin:0; font-size:14.5px; color:#4D4D4A; line-height:1.5; } .emmi-art .value-cta-body a{ align-self:flex-start; background:#004E74; color:#FFFFFF; text-decoration:none; font-size:13.5px; font-weight:700; padding:10px 20px; border-radius:8px; } .emmi-art .value-cta-body a:hover{ background:#003654; } @media (max-width:600px){ .emmi-art .value-cta{ flex-direction:column; } .emmi-art .value-cta-img{ flex:0 0 160px; width:100%; } } .emmi-art .reg-table-wrap{ border-radius:12px; overflow:hidden; border:1px solid #EDEDED; margin:24px 0 32px; } .emmi-art .reg-table{ width:100%; border-collapse:collapse; } .emmi-art .reg-table thead tr{ background:#004E74; } .emmi-art .reg-table th{ text-align:left; padding:14px 16px; color:#FFFFFF; font-size:13px; font-weight:700; } .emmi-art .reg-table td{ padding:12px 16px; font-size:13.5px; color:#4D4D4A; border-bottom:1px solid #EDEDED; } .emmi-art .reg-table tbody tr:nth-child(odd){ background:#FFFFFF; } .emmi-art .reg-table tbody tr:nth-child(even){ background:#F7F7F7; } .emmi-art .reg-table tbody tr:last-child td{ border-bottom:none; } .emmi-art .reg-table td.reg-name{ color:#004E74; font-weight:700; } @media (max-width:680px){ .emmi-art .reg-table-wrap{ overflow-x:auto; } .emmi-art .reg-table{ min-width:520px; } } .emmi-art .checklist-grid{ display:grid; grid-template-columns:repeat(2,1fr); gap:12px; margin:24px 0 32px; } .emmi-art .checklist-card{ display:flex; gap:12px; align-items:flex-start; background:#FFFFFF; border:1px solid #EDEDED; border-radius:12px; padding:14px 16px; } .emmi-art .checklist-card.final{ background:#004E74; grid-column:1 / -1; } .emmi-art .checklist-num{ width:26px; height:26px; border-radius:50%; background:#EAF3DE; color:#206F28; flex-shrink:0; display:flex; align-items:center; justify-content:center; font-size:14px; font-weight:700; } .emmi-art .checklist-card.final .checklist-num{ background:#92C83E; color:#004E74; } .emmi-art .checklist-text{ font-size:13.5px; color:#004E74; font-weight:700; line-height:1.4; } .emmi-art .checklist-card.final .checklist-text{ color:#FFFFFF; } @media (max-width:600px){ .emmi-art .checklist-grid{ grid-template-columns:1fr; } } .emmi-art .reg-scale{ background:#FFFFFF; border:1px solid #EDEDED; border-radius:12px; padding:24px 20px 20px; margin:24px 0 32px; } .emmi-art .reg-scale-bar{ display:flex; height:14px; border-radius:7px; overflow:hidden; } .emmi-art .reg-scale-bar div:nth-child(1){ flex:0.7; background:#C0DD97; } .emmi-art .reg-scale-bar div:nth-child(2){ flex:1.93; background:#92C83E; } .emmi-art .reg-scale-bar div:nth-child(3){ flex:1; background:#004E74; } .emmi-art .reg-scale-marks{ display:flex; margin-top:6px; font-size:11px; color:#98989A; } .emmi-art .reg-scale-marks div:nth-child(1){ flex:0.7; text-align:left; } .emmi-art .reg-scale-marks div:nth-child(2){ flex:1.93; text-align:center; } .emmi-art .reg-scale-marks div:nth-child(3){ flex:1; text-align:right; } .emmi-art .reg-scale-legend{ display:grid; grid-template-columns:repeat(3,1fr); gap:10px; margin-top:18px; } .emmi-art .reg-scale-legend-title{ font-size:12.5px; font-weight:700; margin-bottom:4px; } .emmi-art .reg-scale-legend-text{ font-size:11.5px; color:#4D4D4A; line-height:1.4; } @media (max-width:600px){ .emmi-art .reg-scale-legend{ grid-template-columns:1fr; } } .emmi-art .warranty-grid{ display:grid; grid-template-columns:repeat(3,1fr); gap:12px; margin:24px 0 32px; } .emmi-art .warranty-card{ background:#FFFFFF; border:1px solid #EDEDED; border-radius:12px; padding:16px; } .emmi-art .warranty-icon{ width:36px; height:36px; border-radius:50%; background:#EAF3DE; display:flex; align-items:center; justify-content:center; margin-bottom:10px; } .emmi-art .warranty-title{ font-size:12.5px; font-weight:700; color:#004E74; margin-bottom:6px; } .emmi-art .warranty-text{ font-size:11.5px; color:#4D4D4A; line-height:1.4; } @media (max-width:600px){ .emmi-art .warranty-grid{ grid-template-columns:1fr; } } .emmi-art .faq-block{ margin:24px 0 32px; } .emmi-art .faq-block details{ border-bottom:1px solid #EDEDED; list-style:none; } .emmi-art .faq-block details::marker, .emmi-art .faq-block details::-webkit-details-marker{ display:none; content:""; } .emmi-art .faq-block summary{ font-size:16px; font-weight:700; color:#004E74; cursor:pointer; list-style:none; display:flex; justify-content:space-between; align-items:center; padding:16px 0; } .emmi-art .faq-block summary::marker, .emmi-art .faq-block summary::-webkit-details-marker{ display:none; content:""; } .emmi-art .faq-block summary::after{ content:"+"; font-size:20px; color:#92C83E; font-weight:400; margin-left:12px; flex-shrink:0; } .emmi-art .faq-block details[open] summary::after{ content:"\2013"; } .emmi-art .faq-block details p{ margin:0 0 16px; font-size:14.5px; color:#4D4D4A; line-height:1.6; } .emmi-art .cta-final{ background-image:linear-gradient(rgba(0,78,116,0.88), rgba(0,78,116,0.88)), url('https://emmi.mx/wp-content/uploads/2024/10/DRON-1-1.webp'); background-size:cover; background-position:center; border-radius:16px; padding:36px 32px; text-align:center; margin:24px 0 32px; } .emmi-art .cta-final img{ height:32px; margin-bottom:18px; } .emmi-art .cta-final p{ color:#FFFFFF; font-size:16px; margin:0 0 20px; max-width:480px; margin-left:auto; margin-right:auto; line-height:1.5; } .emmi-art .cta-final a{ display:inline-block; background:#92C83E; color:#004E74; font-weight:700; padding:14px 28px; border-radius:8px; text-decoration:none; } .emmi-art .cta-final a:hover{ background:#206F28; }

Es una decisión que se sostiene entre 20 y 30 años, así que vale la pena evaluarla con el mismo rigor que cualquier otra inversión de capital de esa magnitud.

El checklist completo

1
Tu perfil de consumo, antes que cualquier cotización.
2
Respaldo legal y técnico verificable de la empresa.
3
Certificaciones correctas para tu tipo de proyecto.
4
El marco regulatorio de tu proyecto: qué permiso necesitas y de qué tamaño.
5
Ingeniería estructural revisada, no asumida.
6
Seguros que cubran la obra completa.
7
Una propuesta financiera completa, no un solo número de ahorro.
8
Calidad de equipos y tres garantías que debes exigir por separado.
9
Soporte postventa con compromisos por escrito.
10
Solicitar propuestas a varios proveedores con los mismos datos de consumo, para evaluarlas en igualdad de condiciones.

1. Empieza por tu perfil de consumo

Antes de cotizar un sistema, un buen proveedor debe realizar un análisis detallado de tu consumo real de CFE y tus horarios de demanda.

Este análisis permite identificar tu consumo y demanda, tarifa, horarios de operación de la planta y necesidades energéticas reales. También debe considerar factores como el espacio disponible en techo o terreno y el crecimiento esperado de tu operación. Con esta información se puede dimensionar correctamente la solución y estimar de forma realista su impacto energético y económico.

2. Verifica el respaldo real de la empresa, no solo su discurso comercial

Tres preguntas ayudan a confirmar la capacidad real de una empresa:

  • ¿Es una persona moral constituida, con años de operación verificables? Esto ayuda a confirmar quién puede respaldar en el tiempo una garantía a 25 años.
  • ¿Puede mostrarte proyectos del tamaño del tuyo, con contacto verificable? Un portafolio es más confiable cuando incluye datos técnicos y contacto directo con clientes reales.
  • ¿Qué dicen las reseñas recientes, no solo el promedio? Las menciones específicas de posventa, cumplimiento de tiempos y trámites dicen más sobre cómo opera la empresa hoy que un promedio general.

3. Confirma las certificaciones, y entiende qué certifica cada una

Aquí es donde más se presta a confusión, porque hay certificaciones de personas, de empresas y de equipos, y conviene entender qué cubre cada una.

Los EC0586.01 y EC1181 certifican al personal técnico que instala sistemas fotovoltaicos interconectados a la red en baja tensión (hasta 1000 V) y sin respaldo de baterías. Certifican a las personas, no a la empresa.

Este matiz importa: si tu proyecto interconecta en media tensión, como suele pasar en sistemas industriales de mayor escala, o incluye respaldo con baterías, esta certificación específica no aplica. En ese caso, lo relevante es preguntar directamente por la experiencia comprobable del personal técnico en instalaciones de ese tipo.

Si eres una PyME y buscas financiamiento preferencial a través de la banca comercial, es posible que tu proveedor te mencione el programa CSolar, respaldado por SENER, NAFIN y la Cooperación Alemana (GIZ). Aplica a sistemas de hasta 500-550 kW: si tu proyecto es de mayor escala, conviene evaluarlo con otro criterio.

Las certificaciones de equipo (IEC, UL) y la clasificación Tier 1, en cambio, aplican sin importar el tamaño del proyecto: certifican al fabricante del panel, no al instalador. Pide ambas certificaciones por separado, ya que cubren aspectos distintos de tu sistema.

4. Entiende el marco regulatorio de tu proyecto: qué permiso necesitas

Desde el nuevo Reglamento de la Ley del Sector Eléctrico, publicado el 3 de octubre de 2025 y vigente desde entonces, la capacidad de generación instalada de tu sistema, no tu consumo eléctrico como empresa, determina bajo qué figura opera tu proyecto:

0
0.7 MW
20 MW +
Generación distribuida.
Sin permiso de la CNE.
Autoconsumo interconectado.
Permiso de generación ante la CNE, más interconexión aparte con CENACE/CFE.
Autoconsumo.
Permiso con trámite ordinario.

Un buen proveedor sabe de entrada en cuál de estos rangos cae tu proyecto, y te explica qué implica. Si tu sistema está por debajo de 0.7 MW, no requiere permiso de generación y el proceso es más simple. Si está en el rango de 0.7 a 20 MW, requiere un permiso de generación ante la CNE, además de tramitar la interconexión por separado con CENACE/CFE; desde agosto de 2025 existe un procedimiento simplificado para el permiso de generación, con una resolución máxima de 60 días hábiles.

Un proveedor actualizado distingue claramente entre estas dos figuras y verifica el tamaño real de tu sistema antes de cotizar.

5. Revisa que la ingeniería estructural sea seria, no un supuesto

Un sistema fotovoltaico agrega carga permanente sobre una estructura que, en la mayoría de los casos, fue diseñada para otra cosa. Antes de instalar, debe existir un estudio estructural que evalúe la carga muerta adicional, la carga de viento según tu zona, y el estado real de tu cubierta, idealmente firmado por un perito.

En naves con lámina, además, conviene confirmar con el fabricante de la cubierta que el sistema de fijación propuesto mantiene vigente la garantía del techo.

6. Confirma qué seguros cubren la obra

Durante la instalación, tu proveedor debería contar con una póliza de responsabilidad civil vigente y tener a su personal dado de alta ante el IMSS. Esa cobertura protege a tu empresa ante cualquier eventualidad durante la obra.

7. Exige una propuesta financiera completa

Una propuesta financiera completa va más allá de un solo número, como “sistema de X MW, ahorro de $X millones”. Debe incluir:

IndicadorQué debes revisar
Producción anual.kWh esperados.
Degradación.% anual del sistema.
Autoconsumo.% de generación que realmente usas.
Excedentes.kWh y su tratamiento económico.
CAPEX.Costo total instalado.
OPEX.Mantenimiento y seguros.
Ahorro.Año por año, no solo un promedio.
Payback.Años para recuperar la inversión.
TIR.Tasa interna de retorno.
VPN.Valor presente neto.
Vida útil.Normalmente 20 a 30 años.
Escenario pesimista.Qué pasa con menor generación o mayor costo.

Un buen proveedor también debe explicarte más de una forma de pagar el sistema: CAPEX (inversión propia, el sistema es tuyo desde el día uno), PPA (pagas solo por la energía que consumes, sin invertir en el equipo) o esquemas tipo leasing. Cada modalidad cambia cuánto ahorras desde el primer mes y qué pasa con el sistema al final del contrato.

Caso de éxito EMMI

En EMMI participamos en la construcción de Puerto Libertad, un proyecto de generación a gran escala (utility scale) y una de las plantas fotovoltaicas más grandes de Latinoamérica.

Leer artículo completo

8. Verifica la calidad de los equipos y exige tres garantías por separado

Pide marcas de paneles Tier 1 e inversores de fabricantes industriales reconocidos. Un buen equipo y una instalación de calidad son la base de un sistema confiable a largo plazo.

Aquí un matiz importante: existen tres tipos de garantía distintos, y conviene pedirlos por separado.

De producto.
Cubre defectos de fabricación del panel o inversor. Responde el fabricante.
De desempeño.
Que el panel siga generando cerca de su capacidad original (normalmente 25 años). Responde el fabricante.
De instalación / mano de obra.
Cubre errores de instalación, conexión o montaje. Responde el integrador que instaló.

Cuando una propuesta dice “25 años de garantía”, conviene confirmar a cuál de las tres se refiere. Generalmente es la garantía de desempeño del fabricante, que cubre el panel; la instalación y el inversor conviene cubrirlos con garantías adicionales, solicitadas por separado.

9. Confirma el soporte postventa con compromisos por escrito, no de palabra

Pregunta qué incluye exactamente su servicio de operación y mantenimiento: frecuencia de limpieza, revisión de conexiones, informes de producción, y si existe monitoreo en tiempo real que te avise de una caída en el rendimiento antes de que tú la notes en el recibo.

Pregunta también cuál es su tiempo de respuesta comprometido ante una falla, y si esa respuesta la da el mismo equipo que te vendió el sistema. Un servicio de mantenimiento con contrato y costo definido garantiza una obligación real de seguimiento.

10. Compara propuestas de varios proveedores, con la misma información de entrada

Pide propuestas a más de un proveedor y dales exactamente los mismos datos de consumo, para que las respuestas sean comparables entre sí. Comparar cotizaciones construidas sobre los mismos supuestos es la forma más confiable de elegir bien.

Caso de éxito EMMI

Comparar bien a un proveedor también significa ver su track record en operación real. Conoce cómo EMMI participó en Puerto Peñasco, uno de los parques fotovoltaicos más grandes de Latinoamérica.

Leer artículo completo

Señales de alerta y qué pasa si ya caíste en una

Desconfía si el proveedor…Qué pasa si ya firmaste
Garantiza un ahorro sin haber analizado tus recibos.El ahorro real termina siendo distinto, casi siempre menor, al prometido, y no tienes base contractual para reclamar la diferencia porque nunca existió un cálculo verificable de origen.
No habla de la interconexión ni del permiso regulatorio hasta después de firmar.Puedes terminar con un sistema instalado que no puede conectarse a la red, operando sin el ahorro esperado mientras se resuelve un trámite que debió gestionarse antes de instalar.
No entrega simulaciones de producción.No tienes forma de comprobar si el sistema genera lo que debería una vez instalado, así que un rendimiento bajo puede pasar meses sin detectarse.
No proporciona referencias verificables de otras plantas industriales.No hay forma de anticipar cómo responde la empresa ante fallas reales, y te enteras de sus límites hasta que te toca a ti.
No explica claramente quién asume los costos de interconexión.Es común que estos costos aparezcan después como un cargo adicional no contemplado en la cotización original.
Presenta un retorno extraordinariamente rápido sin justificar los supuestos.Cuando la generación real resulta menor a la prometida, el periodo de recuperación se extiende, sin que exista un mecanismo contractual para ajustar esa expectativa.
Basa su propuesta en una calculadora genérica en línea, sin ajustarla a tu consumo real.Esas calculadoras solo estiman con supuestos promedio (ubicación, tarifa genérica), así que el sistema que te recomiendan puede quedar mal dimensionado para tu operación real.
Ofrece garantía del equipo pero no garantiza la instalación por separado.Si una falla se origina en la instalación, el fabricante del panel puede rechazar la garantía de producto por no ser un problema de fábrica, y no hay quién más responda.
Te presiona para firmar antes de que obtengas otras cotizaciones.Firmas sin un punto de comparación real, lo que dificulta detectar sobreprecios o condiciones desfavorables hasta que ya es tarde para renegociar.
No puede decirte con claridad a quién vas a llamar si algo falla dentro de tres años.Cuando ocurre una falla años después, es común descubrir que el área de postventa nunca existió formalmente, o que el personal a cargo del proyecto ya no trabaja ahí.
En un contrato PPA, no explica qué sucede con el sistema al final del plazo.Al término del contrato puedes terminar negociando desde cero la propiedad de un sistema que ya está instalado en tu planta, en una posición de desventaja frente al proveedor.
Compite únicamente por precio por watt instalado, sin explicar de dónde sale el descuento.Ese ahorro sale de algún lado (calibre de cable, ingeniería, garantías reales o el área de postventa), y ese costo lo terminas pagando después, generalmente en mantenimiento o en una vida útil más corta.

¿Cómo aplica esto en la práctica?

En EMMI trabajamos con ingeniería propia en todo el proceso, desde el levantamiento en planta hasta la puesta en marcha, y con un estudio técnico-económico personalizado antes de cualquier propuesta.

En proyectos como el de Puerto Libertad, un desarrollo de generación a gran escala (utility scale), la claridad sobre el marco regulatorio y la propuesta financiera completa fue la base de todo el proyecto. Es exactamente el mismo nivel de detalle que describe este checklist, aplicado a la escala de cada tipo de proyecto.

Preguntas frecuentes

¿Necesito permiso de la CNE para instalar paneles solares en mi empresa?

Depende de la capacidad de generación instalada de tu sistema, no de cuánto consume tu empresa. Si es menor a 0.7 MW, no necesitas permiso porque opera como generación distribuida. Si está entre 0.7 y 20 MW, necesitas un permiso de generación ante la CNE, además de la interconexión por separado con CENACE/CFE, aunque con un trámite simplificado desde agosto de 2025.

¿Cuántas garantías debo pedir en un sistema fotovoltaico industrial?

Tres, por separado: garantía de producto (defectos de fábrica), garantía de desempeño (que el panel siga generando cerca de su capacidad original, normalmente 25 años) y garantía de instalación o mano de obra, que respalda el integrador, no el fabricante.

¿Qué es mejor, CAPEX, PPA o leasing para financiar un sistema solar?

No hay una respuesta única. CAPEX te da el ahorro completo desde el primer mes porque el sistema es tuyo desde el inicio. PPA no requiere inversión inicial, pero el ahorro mensual suele ser menor. Leasing queda en un punto intermedio. La decisión depende de tu situación financiera y fiscal.

¿Qué certificaciones debe tener un instalador de paneles solares en México?

Al personal técnico lo certifican los estándares EC0586.01 y EC1181, aplicables a sistemas en baja tensión y sin baterías. Para proyectos en media tensión o con BESS, conviene preguntar directamente por la experiencia comprobable del personal.

¿Cómo sé si un proveedor de paneles solares es confiable antes de firmar?

Verifica que sea una empresa con años de operación comprobables, que realice un análisis detallado de tu consumo real de CFE y tus horarios de demanda antes de cotizar, que entregue una propuesta técnico-financiera completa (no solo una cifra de ahorro) y que desglose claramente las garantías.

EMMI

Agenda un estudio técnico-económico con EMMI y compara tu próxima propuesta solar contra un proveedor que ya cumple este checklist.

Agenda tu estudio aquí
]]>
Regulaciones climáticas y ESG en México: lo que tu empresa debe reportar en 2026 https://emmi.mx/blog/regulaciones-climaticas-y-esg-en-mexico-lo-que-tu-empresa-debe-reportar-en-2026?utm_source=rss&utm_medium=rss&utm_campaign=regulaciones-climaticas-y-esg-en-mexico-lo-que-tu-empresa-debe-reportar-en-2026 Thu, 10 Sep 2026 14:47:11 +0000 https://emmi.mx/?p=18130 .emmi-art, .emmi-art * { font-family: 'Open Sans', Arial, sans-serif; } .emmi-art p { margin: 0 0 20px; line-height:1.6; } .emmi-art h2.wp-block-heading { margin: 40px 0 18px; } .emmi-art h3.wp-block-heading { margin: 28px 0 14px; } .emmi-art ul.wp-block-list, .emmi-art ol.wp-block-list{ margin:0 0 20px; padding-left:22px; } .emmi-art ul.wp-block-list li, .emmi-art ol.wp-block-list li{ margin-bottom:8px; line-height:1.55; } .emmi-art .value-cta{ display:flex; background:#F7F7F7; border-radius:12px; overflow:hidden; margin:24px 0 32px; } .emmi-art .value-cta-img{ flex:0 0 200px; background-size:cover; background-position:center; } .emmi-art .value-cta-body{ flex:1; padding:24px 28px; display:flex; flex-direction:column; justify-content:center; gap:12px; } .emmi-art .value-cta-body p{ margin:0; font-size:14.5px; color:#4D4D4A; line-height:1.5; } .emmi-art .value-cta-body a{ align-self:flex-start; background:#004E74; color:#FFFFFF; text-decoration:none; font-size:13.5px; font-weight:700; padding:10px 20px; border-radius:8px; } .emmi-art .value-cta-body a:hover{ background:#003654; } @media (max-width:600px){ .emmi-art .value-cta{ flex-direction:column; } .emmi-art .value-cta-img{ flex:0 0 160px; width:100%; } } .emmi-art .reg-table-wrap{ border-radius:12px; overflow:hidden; border:1px solid #EDEDED; margin:24px 0 32px; } .emmi-art .reg-table{ width:100%; border-collapse:collapse; } .emmi-art .reg-table thead tr{ background:#004E74; } .emmi-art .reg-table th{ text-align:left; padding:14px 16px; color:#FFFFFF; font-size:13px; font-weight:700; } .emmi-art .reg-table td{ padding:14px 16px; font-size:13.5px; color:#4D4D4A; border-bottom:1px solid #EDEDED; } .emmi-art .reg-table tbody tr:nth-child(odd){ background:#FFFFFF; } .emmi-art .reg-table tbody tr:nth-child(even){ background:#F7F7F7; } .emmi-art .reg-table tbody tr:last-child td{ border-bottom:none; } .emmi-art .reg-table td.reg-name{ color:#004E74; font-weight:700; } @media (max-width:680px){ .emmi-art .reg-table-wrap{ overflow-x:auto; } .emmi-art .reg-table{ min-width:640px; } } .emmi-art .purpose-grid{ display:grid; grid-template-columns:repeat(3,1fr); gap:16px; margin:24px 0 32px; } .emmi-art .purpose-card{ background:#FFFFFF; border:1px solid #EDEDED; border-radius:12px; padding:20px; } .emmi-art .purpose-icon{ width:40px; height:40px; border-radius:50%; background:#EAF3DE; display:flex; align-items:center; justify-content:center; margin-bottom:14px; } .emmi-art .purpose-title{ font-size:14px; font-weight:700; color:#004E74; margin-bottom:6px; } .emmi-art .purpose-text{ font-size:12.5px; color:#4D4D4A; line-height:1.5; } @media (max-width:680px){ .emmi-art .purpose-grid{ grid-template-columns:1fr; } } .emmi-art .rep-flow{ display:flex; align-items:stretch; gap:8px; margin:24px 0 32px; } .emmi-art .rep-flow-step{ flex:1; background:#004E74; border-radius:12px; padding:18px 14px; text-align:center; } .emmi-art .rep-flow-icon{ width:36px; height:36px; border-radius:50%; background:rgba(255,255,255,0.15); display:flex; align-items:center; justify-content:center; margin:0 auto 10px; } .emmi-art .rep-flow-title{ font-size:13px; font-weight:700; color:#FFFFFF; margin-bottom:6px; } .emmi-art .rep-flow-text{ font-size:11.5px; color:#A9C6D6; line-height:1.4; } .emmi-art .rep-flow-arrow{ display:flex; align-items:center; color:#98989A; font-size:18px; } @media (max-width:680px){ .emmi-art .rep-flow{ flex-direction:column; } .emmi-art .rep-flow-arrow{ justify-content:center; transform:rotate(90deg); padding:2px 0; } } .emmi-art .cta-final{ background-image:linear-gradient(rgba(0,78,116,0.88), rgba(0,78,116,0.88)), url('https://emmi.mx/wp-content/uploads/2024/10/DRON-1-1.webp'); background-size:cover; background-position:center; border-radius:16px; padding:36px 32px; text-align:center; margin:24px 0 32px; } .emmi-art .cta-final img{ height:32px; margin-bottom:18px; } .emmi-art .cta-final p{ color:#FFFFFF; font-size:16px; margin:0 0 20px; max-width:480px; margin-left:auto; margin-right:auto; line-height:1.5; } .emmi-art .cta-final a{ display:inline-block; background:#92C83E; color:#004E74; font-weight:700; padding:14px 28px; border-radius:8px; text-decoration:none; } .emmi-art .cta-final a:hover{ background:#206F28; }

Lo que cambia en 2026 es que llegó el momento de entregar resultados: por primera vez hay que presentar esos reportes con cifras concretas, ya no basta con tener la política o el plan listo en un documento interno.

Son tres piezas las que arman este panorama regulatorio 2026, cada una con su propio propósito:

Norma contable
Para que bancos, inversionistas y clientes evalúen tu desempeño ambiental y social con cifras verificables en tus propios estados financieros.
Ley ambiental
Los fabricantes se hacen responsables del impacto de sus productos incluso después de que el consumidor los desecha.
Mercado de carbono
Reducir emisiones pasa a tener un costo económico directo, además de un beneficio ambiental.

No todas están en el mismo punto: dos ya exigen algo concreto en 2026 y la tercera todavía está en preparación, pero conocer las tres te ayuda a anticiparte. Empecemos por la norma contable, porque es la que probablemente ya le tocó revisar a tu equipo de finanzas este año.

¿Desde cuándo hay que presentarlo, y qué pasa si no lo haces?

El primer reporte se presenta este mismo año, junto con los estados financieros del ejercicio 2025. La fecha exacta depende de cuándo tu empresa cierra y audita esos estados, pero la obligación ya corre: la norma que la exige se publicó en mayo de 2024 y entró en vigor el 1 de enero de 2025.

No presentarlo no genera una multa automática: la NIS es una norma contable, distinta de una ley fiscal con sanciones económicas directas. Lo que sí ocurre es que tu auditor externo debe señalar la omisión en su dictamen de los estados financieros, como incumplimiento de las Normas de Información Financiera vigentes. Esa señal puede pesar frente a bancos, inversionistas o clientes corporativos que ya piden estados financieros limpios como parte de su propia evaluación de proveedores.

¿Qué exige la Norma de Información de Sostenibilidad (NIS) del CINIF?

El Consejo Mexicano de Normas de Información Financiera y de Sostenibilidad (CINIF) es el organismo que define las reglas contables que usa la mayoría de las empresas mexicanas para preparar sus estados financieros. En mayo de 2024, publicó dos normas dedicadas a sostenibilidad, una que sienta las bases conceptuales y otra que aterriza la obligación concreta:

  • NIS A-1: establece el marco conceptual de sostenibilidad
  • NIS B-1: obliga a revelar 30 Indicadores Básicos de Sostenibilidad (IBSO)

Es esta segunda norma la que de verdad mueve la aguja. Estos 30 indicadores se dividen en 21 cuantitativos (cifras medibles, como consumo de energía, consumo de agua o brecha salarial) y 9 cualitativos (información descriptiva, como políticas de gobernanza). La norma exige revelar los 30 sin excepción; si un indicador no aplica o su valor es cero, la empresa debe declararlo así.

¿A quién aplica?

A cualquier empresa que prepare sus estados financieros bajo las Normas de Información Financiera (NIF) mexicanas, cotice o no en la Bolsa Mexicana de Valores. Eso incluye a la gran mayoría de empresas medianas del país, no solo a las grandes corporaciones públicas.

Existe un alivio transitorio: las empresas pueden omitir por ahora las emisiones de gases de efecto invernadero de alcance 3 (las que ocurren en su cadena de valor, fuera de sus propias instalaciones), pero ese alivio termina al cierre del ejercicio 2026.

La NIS no es la única pieza nueva de este panorama. Mientras esta norma vive dentro de la contabilidad de tu empresa, existe otra regulación completamente distinta, de naturaleza ambiental, que también empezó a aplicar este año.

¿Qué obliga la nueva Ley General de Economía Circular?

El 19 de enero de 2026 se publicó en el Diario Oficial de la Federación la Ley General de Economía Circular, que entró en vigor al día siguiente. A diferencia de la NIS, que es una norma contable, esta es una ley ambiental construida sobre el principio de responsabilidad extendida del productor (REP): quien fabrica o importa un producto sigue siendo responsable de él después de que el consumidor lo desecha. En términos prácticos, esto suele cubrir tres momentos distintos:

Recolección
Recuperar el producto o su empaque una vez desechado
→
Reciclaje o reutilización
Procesar esos materiales para darles un nuevo uso
→
Disposición final
Manejar sin dañar el ambiente lo que no se puede reciclar

Este tipo de esquemas, en otros países que ya los aplican, suele empezar por categorías de productos con alto impacto ambiental, como envases y empaques, aparatos eléctricos y electrónicos, llantas, o pilas y baterías. En México, plásticos ya se ha mencionado como una de las categorías prioritarias, aunque el resto del listado todavía depende de la reglamentación pendiente.

¿A quién aplica?

A personas físicas y morales, productoras o importadoras, de los sectores industrial, comercial y de servicios. Pero las obligaciones no se activan igual para todos desde el primer día: se van sumando sector por sector, conforme se publiquen los Acuerdos Generales de Implementación de la REP correspondientes a cada categoría de producto.

Aquí conviene una actualización: el Ejecutivo Federal tenía hasta el 19 de julio de 2026 para publicar el reglamento de la ley, y ese plazo ya venció sin que el documento se haya emitido. Sin el reglamento, tampoco existen todavía los acuerdos que definirán qué sectores entran primero ni qué metas deben cumplir. Es recomendable seguir de cerca esa publicación antes de asumir plazos definitivos.

Existe todavía una tercera pieza en este panorama, aunque conviene aclarar desde ya que no arranca en 2026 y no aplica de la misma forma a todas las empresas.

¿A quién le aplica el Sistema de Comercio de Emisiones?

El Registro Nacional de Emisiones (RENE) existe desde 2015 bajo la Ley General de Cambio Climático, y obliga a reportar a instalaciones con emisiones anuales de 25,000 toneladas de CO2 equivalente o más. El Sistema de Comercio de Emisiones, el mercado de carbono mexicano, lleva varios años en una fase de prueba sin sanciones económicas. En septiembre de 2026, la Secretaría de Medio Ambiente y Recursos Naturales confirmó que su primera fase operativa, esta vez con obligaciones sancionables económicamente, arrancará en 2027.

¿A quién aplica directamente?

Únicamente a instalaciones de los sectores energía e industria con emisiones directas de 100,000 toneladas de CO2 equivalente o más al año, un umbral que normalmente solo alcanzan plantas cementeras, acereras o grandes generadoras eléctricas.

¿Y si mi empresa no llega a ese umbral?

Si tu empresa es una PyME o mediana industrial, es poco probable que este sistema te aplique directamente. Puede afectarte de forma indirecta si vendes a una empresa corporativa que sí está sujeta a este mercado: cada vez es más común que te pidan datos de tu propio consumo energético y tus emisiones como parte de su cadena de suministro.

¿Y los impuestos estatales al carbono?

Aparte del sistema federal, 11 estados de México ya cobran impuestos relacionados con emisiones de carbono, con cuotas que van de $58 a $692 pesos por tonelada. Estos impuestos operan de forma independiente al Sistema de Comercio de Emisiones, así que aunque tu empresa no llegue al umbral federal de 100,000 toneladas, vale la pena revisar si tu estado ya tiene una de estas cuotas vigente.

El sistema federal contempla además un mecanismo de flexibilidad: parte de las obligaciones de una empresa participante podría cubrirse con proyectos de reducción o absorción de emisiones, e incluso con certificados de carbono, aunque los criterios para reconocer esos proyectos todavía se están definiendo. Semarnat también reconoce un reto pendiente: evitar que una misma tonelada de CO2 se cuente dos veces entre el sistema federal y los impuestos estatales. Son señales de que el mercado de carbono mexicano sigue en construcción, así que conviene tratarlo como un tema en movimiento, no como una regla ya cerrada.

Panorama regulatorio 2026, de un vistazo

Regulación Qué exige A quién aplica Fecha clave
NIS A-1 / NIS B-1 (CINIF) Revelar 30 indicadores de sostenibilidad (IBSO) junto a los estados financieros Empresas que reportan bajo NIF, coticen o no en bolsa Primer reporte obligatorio en 2026, con datos de 2025
Ley General de Economía Circular Responsabilidad extendida del productor sobre el ciclo de vida de sus productos Productores e importadores, por sector, conforme se publiquen los acuerdos Vigente desde el 20 de enero de 2026; reglamento pendiente
Sistema de Comercio de Emisiones Cumplir un tope de emisiones o comprar derechos/compensaciones Instalaciones de energía e industria con más de 100,000 ton CO2/año Fase operativa obligatoria a partir de 2027 (confirmado por Semarnat en septiembre de 2026)

Si estás por empezar un proyecto de Autoconsumo Solar

Entiende a fondo cómo funciona un sistema fotovoltaico, qué tipos de paneles existen y qué dice la regulación vigente en nuestra guía completa.

Leer guía completa

Varios de los 30 indicadores IBSO de la NIS B-1, y buena parte de lo que pide un cliente corporativo que exige datos de sostenibilidad a sus proveedores, giran alrededor de consumo energético y emisiones de alcance 1 y 2 (las que genera tu propia operación). Por eso, si tu empresa todavía no tiene un sistema de energía solar, conviene diseñarlo pensando también en estos reportes desde el inicio:

  • Monitoreo propio: un sistema con monitoreo genera de forma continua los datos de energía generada, energía consumida de la red y CO2 evitado
  • Esos datos quedan documentados automáticamente, en vez de reconstruirse después con estimaciones
  • Esa base de datos verificable cubre directamente la parte energética de los indicadores IBSO, aunque no sustituye el reporte completo de sostenibilidad

Ese tipo de trazabilidad es justo lo que distingue a un reporte defendible de uno construido a último momento con cifras aproximadas.

Instalar un sistema solar también trae un beneficio fiscal directo: descubre cómo el artículo 34 de la LISR te permite deducir hasta el 100% de tu inversión en el primer año.

Leer artículo completo

Si ya tienes un sistema solar y evalúas ampliarlo

Para empresas que ya cuentan con paneles solares y evalúan sumar almacenamiento con baterías (BESS) u otras soluciones, la lógica de fondo es la misma, solo que con más terreno cubierto:

  • Un sistema ampliado sigue generando el mismo tipo de datos verificables, ahora con mayor cobertura de tu consumo total
  • La continuidad operativa que aporta el respaldo con baterías es, en sí misma, un dato relevante para reportes de resiliencia operativa ante clientes corporativos
  • Ampliar el sistema no cambia tus obligaciones de reporte, pero sí mejora la calidad y el alcance de los datos que puedes presentar

En ambos casos, el punto de partida es el mismo: entender primero qué está pasando con tu consumo, antes de decidir qué construir sobre esa base.

Este artículo tiene un alcance informativo y se enfoca en la parte energética del cumplimiento; para saber cómo aplican estas normas a tu empresa en particular, conviene validarlo con tu equipo contable o legal. Un estudio técnico-económico con EMMI puede mostrarte, con datos de tu propio consumo, qué tanto ayudaría un sistema de energía solar, nuevo o ampliado, a la parte energética de este reporte.

EMMI

Agenda un estudio técnico-económico con EMMI y descubre qué tanto ayudaría un sistema de energía solar a la parte energética de tu reporte de sostenibilidad.

Agenda tu estudio aquí
]]>
Instalar paneles solares reduce hasta 30% de tu pago de ISR frente al SAT https://emmi.mx/blog/instalar-paneles-solares-reduce-isr?utm_source=rss&utm_medium=rss&utm_campaign=instalar-paneles-solares-reduce-isr Wed, 26 Aug 2026 08:00:00 +0000 https://emmi.mx/?p=18092 .emmi-art, .emmi-art * { font-family: 'Open Sans', Arial, sans-serif; } .emmi-art p { margin: 0 0 20px; line-height:1.6; } .emmi-art h2.wp-block-heading { margin: 40px 0 18px; } .emmi-art h3.wp-block-heading { margin: 28px 0 14px; } .emmi-art .value-cta{ display:flex; background:#F7F7F7; border-radius:12px; overflow:hidden; margin:24px 0 32px; } .emmi-art .value-cta-img{ flex:0 0 200px; background-size:cover; background-position:center; } .emmi-art .value-cta-body{ flex:1; padding:24px 28px; display:flex; flex-direction:column; justify-content:center; gap:12px; } .emmi-art .value-cta-body p{ margin:0; font-size:14.5px; color:#4D4D4A; line-height:1.5; } .emmi-art .value-cta-body a{ align-self:flex-start; background:#004E74; color:#FFFFFF; text-decoration:none; font-size:13.5px; font-weight:700; padding:10px 20px; border-radius:8px; } .emmi-art .value-cta-body a:hover{ background:#003654; } @media (max-width:600px){ .emmi-art .value-cta{ flex-direction:column; } .emmi-art .value-cta-img{ flex:0 0 160px; width:100%; } } .emmi-art .fiscal-steps{ background:#FFFFFF; border:1px solid #EDEDED; border-radius:16px; padding:32px; margin:24px 0 8px; } .emmi-art .fiscal-steps-body{ position:relative; padding-left:46px; } .emmi-art .fiscal-steps-line{ position:absolute; left:15px; top:6px; bottom:6px; width:2px; background:#E0E7EB; } .emmi-art .fiscal-step{ position:relative; margin-bottom:26px; } .emmi-art .fiscal-step:last-child{ margin-bottom:8px; } .emmi-art .fiscal-step-icon{ position:absolute; left:-46px; top:0; width:32px; height:32px; border-radius:50%; font-weight:700; font-size:14px; display:flex; align-items:center; justify-content:center; } .emmi-art .fiscal-step-icon.neutral{ background:#F2F2F2; color:#4D4D4A; } .emmi-art .fiscal-step-icon.highlight{ background:#EFF7E2; color:#92C83E; } .emmi-art .fiscal-step-icon.final{ background:#92C83E; color:#FFFFFF; } .emmi-art .fiscal-step-title{ font-size:15px; font-weight:700; margin-bottom:4px; } .emmi-art .fiscal-step-title.neutral{ color:#4D4D4A; } .emmi-art .fiscal-step-title.accent{ color:#004E74; } .emmi-art .fiscal-step-text{ font-size:14.5px; color:#4D4D4A; line-height:1.5; } .emmi-art .fiscal-summary{ display:grid; grid-template-columns:1fr 1fr; gap:16px; margin:28px 0 0; } .emmi-art .fiscal-summary-card{ border-radius:8px; padding:18px; text-align:center; } .emmi-art .fiscal-summary-card.neutral{ background:#F7F7F7; } .emmi-art .fiscal-summary-card.accent{ background:#004E74; } .emmi-art .fiscal-summary-label{ font-size:11.5px; font-weight:700; text-transform:uppercase; letter-spacing:0.04em; margin-bottom:6px; } .emmi-art .fiscal-summary-label.neutral{ color:#98989A; } .emmi-art .fiscal-summary-label.accent{ color:#A9C6D6; } .emmi-art .fiscal-summary-value{ font-size:20px; font-weight:800; } .emmi-art .fiscal-summary-value.neutral{ color:#004E74; } .emmi-art .fiscal-summary-value.accent{ color:#92C83E; } .emmi-art .fiscal-summary-note{ font-size:12.5px; margin-top:4px; } .emmi-art .fiscal-summary-note.neutral{ color:#4D4D4A; } .emmi-art .fiscal-summary-note.accent{ color:#FFFFFF; } .emmi-art .fiscal-footer{ display:flex; justify-content:space-between; align-items:flex-end; margin-top:24px; } .emmi-art .fiscal-footer-note{ font-size:12.5px; color:#98989A; font-weight:300; max-width:420px; line-height:1.5; } .emmi-art .fiscal-footer-logo{ flex-shrink:0; margin-left:12px; } .emmi-art .fiscal-footer-logo img{ height:22px; display:block; } @media (max-width:600px){ .emmi-art .fiscal-summary{ grid-template-columns:1fr; } .emmi-art .fiscal-footer{ flex-direction:column; align-items:flex-start; gap:12px; } } .emmi-art .compare-grid{ display:grid; grid-template-columns:repeat(3, 1fr); gap:16px; margin:24px 0 8px; } .emmi-art .compare-card{ text-align:center; padding:32px 24px; background:#004E74; border-radius:8px; transition:background 0.25s ease; } .emmi-art .compare-card:hover{ background:#003654; } .emmi-art .compare-label{ font-size:14px; color:#A9C6D6; font-weight:600; margin-bottom:8px; } .emmi-art .compare-value{ font-weight:800; color:#92C83E; font-size:clamp(22px,4vw,30px); line-height:1.2; margin-bottom:12px; } .emmi-art .compare-note{ font-size:14.5px; color:#FFFFFF; line-height:1.55; } @media (max-width:680px){ .emmi-art .compare-grid{ grid-template-columns:1fr; } } .emmi-art ul.wp-block-list, .emmi-art ol.wp-block-list{ margin:0 0 20px; padding-left:22px; } .emmi-art ul.wp-block-list li, .emmi-art ol.wp-block-list li{ margin-bottom:8px; line-height:1.55; } .emmi-art .note-italic{ font-size:13px; color:#4D4D4A; font-style:italic; margin:0 0 20px; } .emmi-art .cta-final{ background-image:linear-gradient(rgba(0,78,116,0.88), rgba(0,78,116,0.88)), url('https://emmi.mx/wp-content/uploads/2024/10/DRON-1-1.webp'); background-size:cover; background-position:center; border-radius:16px; padding:36px 32px; text-align:center; margin:24px 0 32px; } .emmi-art .cta-final img{ height:32px; margin-bottom:18px; } .emmi-art .cta-final p{ color:#FFFFFF; font-size:16px; margin:0 0 20px; max-width:480px; margin-left:auto; margin-right:auto; line-height:1.5; } .emmi-art .cta-final a{ display:inline-block; background:#92C83E; color:#004E74; font-weight:700; padding:14px 28px; border-radius:8px; text-decoration:none; } .emmi-art .cta-final a:hover{ background:#206F28; }

La Ley del Impuesto Sobre la Renta contempla una deducción que puede transformar por completo el análisis financiero de un proyecto de energía solar desde el primer año de operación.

Conoce qué dice el artículo 34 de la Ley del Impuesto Sobre la Renta

El artículo 34, fracción XIII de la Ley del Impuesto Sobre la Renta establece que la maquinaria y equipo destinados a la generación de energía a partir de fuentes renovables se pueden deducir al 100% en un solo ejercicio fiscal. Esto incluye paneles, inversores, estructura de montaje e instalación de un sistema fotovoltaico industrial.

A diferencia de la depreciación tradicional de activos fijos, que reparte el costo en varios años, esta deducción permite aplicar el 100% del gasto a tu base gravable en el mismo año, en lugar de repartirlo en varios ejercicios.

Tres datos clave del beneficio

Deducción
100%
de la inversión es deducible en el primer ejercicio fiscal.
Tasa ISR
30%
tasa para personas morales, define el tamaño real del ahorro.
Permanencia
5 años
mínimo de operación para conservar el beneficio.

¿Cuánto puedes ahorrar en ISR con esta deducción?

Para ilustrar el mecanismo, imagina que tu empresa necesita invertir $3,000,000 MXN en infraestructura para reducir su gasto energético. El tipo de equipo que elijas cambia por completo el tratamiento fiscal de esa inversión.

A
Inviertes $3,000,000 MXN en equipo de generación convencional
Por ejemplo, una planta de respaldo con combustible fósil. Al no ser una fuente renovable, este equipo se deprecia de forma normal: divides el costo entre 10 años y deduces $300,000 cada ejercicio.
A
Ese ahorro fiscal se refleja poco a poco, año tras año
Cada $300,000 deducido reduce tu ISR a pagar en $90,000 ese año (con la tasa de personas morales del 30%). Necesitas 10 ejercicios fiscales para acumular ese mismo ahorro total de $900,000.
B
Si en cambio inviertes esos mismos $3,000,000 en un sistema fotovoltaico
Por tratarse de equipo para generación de energía renovable, el artículo 34 de la LISR te permite deducir el 100% de la inversión en el mismo ejercicio fiscal. No hay trámite especial: aplicas la deducción directamente en tu declaración, cumpliendo los requisitos documentales.
B
Y pagas $900,000 menos de ISR ese mismo año
Al reducir tu base gravable en $3,000,000 de una sola vez, el ISR que le debes al SAT ese ejercicio baja en $900,000. El efecto se refleja en tus pagos provisionales durante el año y se confirma en tu declaración anual; no es un depósito ni un reembolso.
Equipo convencional
$90,000/año
menos de ISR, durante 10 años
Sistema fotovoltaico
$900,000
menos de ISR, en el año 1

Este ejemplo usa cifras ilustrativas para explicar el mecanismo. El beneficio fiscal exacto depende de la situación particular de cada empresa y debe validarse con su asesor fiscal.

Descubre cuánto bajaría tu recibo de CFE con energía solar y cómo se combina ese ahorro con este mismo beneficio fiscal, con datos reales por tarifa y tamaño de consumo.

Leer artículo completo

¿Qué se necesita para aplicar la deducción?

  1. CFDI: contar con el comprobante fiscal de la inversión a nombre de la empresa, con el RFC y la descripción correcta del equipo
  2. Uso exclusivo: destinar el equipo exclusivamente a la generación de energía a partir de fuentes renovables
  3. Permanencia: mantener el sistema en operación durante un mínimo de 5 años inmediatos posteriores al ejercicio en que se aplicó la deducción

Si el sistema deja de operar antes de ese plazo, la empresa debe cubrir el impuesto correspondiente a la diferencia entre lo deducido y lo que debió deducirse cada año, salvo los casos de caso fortuito o fuerza mayor que contempla el artículo 37 de la misma ley.

¿Qué sistema le conviene a tu planta?

El beneficio fiscal aplica sin importar la configuración del sistema, pero la configuración sí determina qué tanto resuelve el proyecto para tu operación.

Un sistema de solo paneles solares genera energía limpia en sitio y reduce el gasto de CFE desde los primeros meses. Es la opción con menor inversión inicial y funciona bien para plantas sin problemas de continuidad eléctrica, donde el objetivo principal es el ahorro.

Entiende a fondo cómo funciona un sistema fotovoltaico, qué tipos de paneles existen y qué dice la regulación vigente en nuestra guía completa.

Leer guía completa

Un sistema de paneles solares con almacenamiento (BESS) suma respaldo energético a la generación solar. Además del ahorro en CFE, evita microcortes y apagones, y mantiene la operación de líneas de producción críticas incluso ante fallas de la red. Es la opción que más se justifica en plantas donde una interrupción eléctrica representa pérdidas directas de producción.

La decisión entre una u otra configuración depende del consumo real de la planta, del historial de interrupciones eléctricas y del retorno esperado.

Por eso, antes de presentar cualquier propuesta, en EMMI realizamos un estudio técnico personalizado. Nuestros expertos podrán realizar un análisis con datos reales de consumo de la planta y determinar qué combinación de equipo, modalidad de financiamiento y estructura fiscal conviene a cada empresa.

Ese estudio es también donde se junta todo el análisis financiero completo: el ahorro mensual en CFE, los beneficios fiscales asociados y el retorno de inversión proyectado.

EMMI

Agenda un estudio personalizado con EMMI y descubre cuánto puedes deducir y ahorrar en la operación de tu planta.

Agenda tu estudio aquí
]]>
¿Cuánto pagarías menos a CFE el primer año con energía solar? Estimación real por tarifa y tamaño de consumo  https://emmi.mx/blog/cuanto-pagaras-menos-a-cfe-con-energia-solar?utm_source=rss&utm_medium=rss&utm_campaign=cuanto-pagaras-menos-a-cfe-con-energia-solar Mon, 27 Jul 2026 18:00:13 +0000 https://emmi.mx/?p=17092 .emmi-art, .emmi-art * { font-family: 'Open Sans', Arial, sans-serif; } .emmi-art p { margin: 0 0 20px; line-height:1.6; } .emmi-art h2.wp-block-heading { margin: 40px 0 18px; } .emmi-art h3.wp-block-heading { margin: 28px 0 14px; } .emmi-art .compare-grid{ display:grid; grid-template-columns:repeat(2, 1fr); gap:16px; margin:24px 0 8px; } .emmi-art .compare-card{ text-align:center; padding:32px 24px; background:#004E74; border-radius:8px; transition:background 0.25s ease; } .emmi-art .compare-card:hover{ background:#003654; } .emmi-art .compare-label{ font-size:14px; color:#A9C6D6; font-weight:600; margin-bottom:8px; } .emmi-art .compare-value{ font-weight:800; color:#92C83E; font-size:clamp(22px,4vw,30px); line-height:1.2; margin-bottom:12px; } .emmi-art .compare-value.final{ color:#92C83E; } .emmi-art .compare-note{ font-size:14.5px; color:#FFFFFF; line-height:1.55; } @media (max-width:680px){ .emmi-art .compare-grid{ grid-template-columns:1fr; } } .emmi-art .value-cta{ display:flex; background:#F7F7F7; border-radius:12px; overflow:hidden; margin:24px 0 32px; } .emmi-art .value-cta-img{ flex:0 0 200px; background-size:cover; background-position:center; } .emmi-art .value-cta-body{ flex:1; padding:24px 28px; display:flex; flex-direction:column; justify-content:center; gap:12px; } .emmi-art .value-cta-body p{ margin:0; font-size:14.5px; color:#4D4D4A; line-height:1.5; } .emmi-art .value-cta-body a{ align-self:flex-start; background:#004E74; color:#FFFFFF; text-decoration:none; font-size:13.5px; font-weight:700; padding:10px 20px; border-radius:8px; } .emmi-art .value-cta-body a:hover{ background:#003654; } @media (max-width:600px){ .emmi-art .value-cta{ flex-direction:column; } .emmi-art .value-cta-img{ flex:0 0 160px; width:100%; } } .emmi-art .sit-sol{ background:#FFFFFF; border:1px solid #EDEDED; border-radius:16px; padding:32px; margin:24px 0 32px; } .emmi-art .sit-sol-title{ font-size:20px; font-weight:700; color:#004E74; line-height:1.3; margin:0 0 24px; } .emmi-art .sit-sol-label{ font-size:11.5px; font-weight:700; text-transform:uppercase; letter-spacing:0.05em; margin-bottom:12px; } .emmi-art .sit-sol-label.situacion{ color:#98989A; } .emmi-art .sit-sol-label.solucion{ color:#92C83E; } .emmi-art .sit-sol-steps{ display:flex; flex-direction:column; gap:14px; } .emmi-art .sit-sol-step{ display:flex; gap:14px; align-items:flex-start; } .emmi-art .sit-sol-icon{ width:32px; height:32px; border-radius:50%; flex-shrink:0; display:flex; align-items:center; justify-content:center; font-size:15px; } .emmi-art .sit-sol-icon.situacion{ background:#F2F2F2; color:#4D4D4A; font-weight:700; } .emmi-art .sit-sol-icon.solucion{ background:#EFF7E2; color:#92C83E; } .emmi-art .sit-sol-text{ line-height:1.4; padding-top:4px; } .emmi-art .sit-sol-text.situacion{ font-size:15px; font-weight:300; color:#4D4D4A; } .emmi-art .sit-sol-text.solucion{ font-size:15px; font-weight:700; color:#004E74; } .emmi-art .sit-sol-divider{ height:1px; background:#EDEDED; margin:24px 0; } .emmi-art .sit-sol-footer{ display:flex; justify-content:space-between; align-items:flex-end; margin-top:26px; } .emmi-art .sit-sol-quote{ font-size:12.5px; color:#98989A; font-weight:300; max-width:320px; line-height:1.5; } .emmi-art .sit-sol-logo{ flex-shrink:0; margin-left:12px; } .emmi-art .sit-sol-logo img{ height:22px; display:block; } .emmi-art ul.wp-block-list, .emmi-art ol.wp-block-list{ margin:0 0 20px; padding-left:22px; } .emmi-art ul.wp-block-list li, .emmi-art ol.wp-block-list li{ margin-bottom:8px; line-height:1.55; } .emmi-art .faq-block{ margin:24px 0 32px; } .emmi-art .faq-block summary{ font-size:16px; font-weight:700; color:#004E74; cursor:pointer; list-style:none; display:flex; justify-content:space-between; align-items:center; padding:16px 0; } .emmi-art .faq-block summary::-webkit-details-marker{ display:none; } .emmi-art .faq-block summary::after{ content:"+"; font-size:20px; color:#92C83E; font-weight:400; margin-left:12px; flex-shrink:0; } .emmi-art .faq-block details[open] summary::after{ content:"–"; } .emmi-art .faq-block details{ border-bottom:1px solid #EDEDED; } .emmi-art .faq-block details p{ margin:0 0 16px; font-size:14.5px; color:#4D4D4A; line-height:1.6; } .emmi-art .cta-final{ background-image:linear-gradient(rgba(0,78,116,0.88), rgba(0,78,116,0.88)), url('https://emmi.mx/wp-content/uploads/2024/10/DRON-1-1.webp'); background-size:cover; background-position:center; border-radius:16px; padding:36px 32px; text-align:center; margin:24px 0 32px; } .emmi-art .cta-final img{ height:32px; margin-bottom:18px; } .emmi-art .cta-final p{ color:#FFFFFF; font-size:16px; margin:0 0 20px; max-width:480px; margin-left:auto; margin-right:auto; line-height:1.5; } .emmi-art .cta-final a{ display:inline-block; background:#92C83E; color:#004E74; font-weight:700; padding:14px 28px; border-radius:8px; text-decoration:none; } .emmi-art .cta-final a:hover{ background:#206F28; } .emmi-art .social-block{ background:#F7F7F7; border-radius:12px; padding:28px 30px; margin:24px 0 32px; } .emmi-art .social-block h4{ font-size:17px; font-weight:700; color:#004E74; margin:0 0 8px; } .emmi-art .social-block p{ font-size:14.5px; color:#4D4D4A; margin:0 0 18px; max-width:520px; line-height:1.5; } .emmi-art .social-links{ display:flex; gap:10px; flex-wrap:wrap; } .emmi-art .social-links a{ display:inline-flex; align-items:center; gap:8px; background:#FFFFFF; border:1px solid #E0E0E0; border-radius:8px; padding:9px 16px; font-size:13.5px; font-weight:700; text-decoration:none; color:#004E74; } .emmi-art .social-links a:hover{ border-color:#92C83E; color:#92C83E; } .emmi-art .social-links svg{ width:16px; height:16px; fill:currentColor; flex-shrink:0; } .emmi-art .note-italic{ font-size:13px; color:#4D4D4A; font-style:italic; margin:0 0 20px; }

El rango exacto depende de tu tarifa, del tamaño de tu planta, de la región donde operas y de si financias el proyecto con inversión propia o con un contrato de suministro. Al conocer esas cuatro variables puedes calcular el ahorro real. Te explicamos cómo hacerlo tomando como base los datos oficiales de la Comisión Nacional de Energía.

¿Por qué usualmente se estima un ahorro del 30% al 95% con paneles solares?

En una factura de CFE bajo tarifa GDMTH, tu recibo se compone de dos cargos principales: energía (lo que consumes) y demanda (tu pico máximo de consumo cada mes). Un sistema de paneles solares reduce el cargo de energía de forma directa. El cargo de demanda es distinto: solo baja si tu pico de consumo ocurre durante las horas de sol.

A continuación puedes ver primero cómo se divide tu recibo entre estos dos cargos, y después qué pasa con cada uno según el horario de tu consumo.

Cargo de energía
60%–75%
Se reduce directamente mientras tu instalación fotovoltaica genera electricidad.
Cargo de demanda
Resto del recibo
Solo baja si tu pico de consumo coincide con horas de sol.
DÍA
Pico de demanda diurno
Tu instalación fotovoltaica absorbe ese pico directamente y también reduce tu cargo de demanda.
NOCHE
Pico de demanda nocturno
Ya no hay generación solar a esa hora, así que ese cargo se mantiene casi igual.

Por eso dos plantas con el mismo tamaño de instalación fotovoltaica pueden terminar con ahorros distintos: todo depende de cuándo ocurre su pico de demanda y qué tan alto es su cargo de energía respecto al total.

Un ejemplo con números

Para entender cómo se conectan estas dos variables (la proporción del cargo de energía en tu recibo y la cobertura de tu instalación fotovoltaica), mira este caso hipotético:

Recibo mensual
$500,000
Total a pagar en el mes
Cargo de energía
$350,000
70% del recibo, según la proporción típica de GDMTH
Ahorro mensual
$175,000
Tu instalación fotovoltaica cubre 50% de esa energía
Ahorro real
35%
Sobre el recibo total, dentro del rango de 35%–95%

Tu región también influye en cuánto pagas

De acuerdo con las tarifas finales del Suministro Básico publicadas por la Comisión Nacional de Energía en febrero de 2026 (Diario Oficial de la Federación), el cargo de energía bajo GDMTH varía de forma importante según la región. Por ejemplo:

  • En Baja California Sur, el precio en horario punta es de $3.5553 por kWh, el más alto del país.
  • En Bajío, el horario punta se ubica en $1.9429 por kWh y el horario base en $0.8617.
  • En Noroeste, el horario punta es de $1.5307 por kWh.

Una empresa en Baja California Sur tiene un incentivo económico distinto al de una empresa en el Bajío, aunque las dos paguen tarifa GDMTH. La región donde está tu planta cambia el cálculo tanto como el tamaño de tu operación.

Y en tu planta, ¿cuánto sería?

El ahorro real de tu planta depende de tu consumo, tu demanda contratada, la región donde operas y el espacio disponible para instalar tu sistema de paneles solares, entre otras variables. Como referencia, las plantas industriales con tarifa GDMTH suelen alcanzar coberturas de entre 30% y 95% de su consumo total, dependiendo de estos factores.

Un equipo técnico y especializado como el de EMMI es quien determina, con base en tu recibo de CFE y tu perfil de consumo real, la solución más viable para tu planta y el ahorro específico que puedes esperar.

Profundiza más sobre cómo funciona técnicamente una instalación fotovoltaica y qué regulación aplica según su tamaño en nuestra guía completa.

Profundiza más sobre cómo funciona técnicamente una instalación fotovoltaica y qué regulación aplica según su tamaño en nuestra guía completa.

Leer guía completa

¿Comprar el sistema o pagar por la energía?

Existen dos esquemas principales para financiar una instalación fotovoltaica: CAPEX, con inversión propia, o PPA, sin inversión inicial. La diferencia entre ambos cambia en cuánto ahorras desde el primer mes.

CAPEX
Ahorro inmediato y completo
Inversión propia. El ahorro en tu recibo de CFE inicia desde el primer mes de operación.
PPA
Cero inversión inicial
Sin capital propio. Pagas un precio fijo por la energía consumida. El ahorro mensual suele ser menor que con CAPEX.

Con CAPEX, el ahorro en el recibo es inmediato y completo desde el primer mes de operación y se suma el beneficio fiscal del Artículo 34, fracción XIII de la Ley del ISR: la maquinaria para generación de energía renovable es deducible al 100% en el primer ejercicio fiscal. Esto reduce el costo real neto del proyecto.

Con PPA (Power Purchase Agreement), no hay inversión inicial. En su lugar, pagas un precio fijo por la energía que consume tu instalación fotovoltaica, típicamente por 10 o 15 años. El ahorro mensual suele ser menor que con CAPEX, porque una parte de ese ahorro se destina a pagar el precio pactado del PPA, el beneficio está en que no comprometes capital de trabajo.

Si tu planta opera de noche, el cálculo cambia

Todo lo que hemos visto hasta ahora asume que tu consumo ocurre principalmente durante el día. Pero si tu planta opera con turnos nocturnos, o tiene un consumo importante entre las 8 y las 10 de la noche, una instalación fotovoltaica por sí sola cubre una parte menor de tu operación, porque en esas horas ya no hay generación solar.

Analicemos lo que pasa en una planta con refrigeración continua

Situación
24
Las plantas de alimentos y farmacéutica suelen mantener cámaras de refrigeración activas las 24 horas para no romper la cadena de frío, sin importar el horario. Ese consumo nocturno es justo donde un sistema de almacenamiento con baterías genera más valor.
Solución
🔋

Un sistema de almacenamiento con baterías (BESS) es una tecnología complementaria que carga con la energía solar generada durante el día y la libera cuando ya no hay sol.

Parte de ese ahorro proviene de la supresión del cargo por capacidad, lo que acerca el ahorro real de una planta con consumo nocturno al mismo rango que una planta con operación estrictamente diurna.

Descubre cómo el autoconsumo con baterías extiende el ahorro solar más allá de las horas de sol en nuestro artículo completo.

Leer artículo

Lo que puedes hacer ahora

  1. Comparte tu recibo de CFE con nuestro equipo técnico.
  2. Cuéntanos los horarios y turnos de operación de tu planta (1, 2 o 3 turnos), para identificar tu consumo en horario intermedio y punta.
  3. Indícanos la ubicación de tu planta.
  4. Solicita un diagnóstico técnico que calcule tu ahorro real, cruzando tu curva de consumo con el tamaño de sistema que necesitas.

Preguntas frecuentes

¿El ahorro del 35% al 95% aplica desde el primer mes?

Sí, en un esquema CAPEX el ahorro es visible desde que la instalación fotovoltaica entra en operación. En un esquema PPA, el ahorro también es visible desde el primer día, ya que el costo pactado de la energía es inferior a la tarifa de CFE.

¿Necesito cambiar de tarifa para instalar paneles solares?

No necesariamente. La instalación fotovoltaica se dimensiona según tu tarifa actual y tu perfil de consumo.

¿Cómo sé qué tamaño de instalación fotovoltaica necesito?

Se calcula a partir de tu consumo mensual en kWh, tu curva horaria de demanda y la radiación solar de tu región. Eso es justo lo que revisa nuestro equipo técnico especializado, para implementar una solución a la medida e integral acorde a tus necesidades.

EMMI

Agenda un diagnóstico técnico personalizado con EMMI y descubre cuánto ahorrarías tú, con base en tu recibo real.

Agenda tu diagnóstico aquí
]]>
¿Por qué tu factura de CFE sigue más cara en 2026? Así se están blindando las empresas industriales https://emmi.mx/blog/factura-de-cfe-sigue-mas-cara-asi-blindan-empresas-industriales?utm_source=rss&utm_medium=rss&utm_campaign=factura-de-cfe-sigue-mas-cara-asi-blindan-empresas-industriales Tue, 21 Jul 2026 21:11:17 +0000 https://emmi.mx/?p=17210 .emmi-art, .emmi-art * { font-family: 'Open Sans', Arial, sans-serif; } .emmi-art p { margin: 0 0 20px; line-height:1.6; } .emmi-art h2.wp-block-heading { margin: 40px 0 18px; } .emmi-art h3.wp-block-heading { margin: 28px 0 14px; } .emmi-art .compare-grid{ display:grid; grid-template-columns:repeat(2, 1fr); gap:16px; margin:24px 0 8px; } .emmi-art .compare-grid.grid-3{ grid-template-columns:repeat(3, 1fr); } .emmi-art .compare-card{ text-align:center; padding:32px 24px; background:#004E74; border-radius:8px; transition:background 0.25s ease; } .emmi-art .compare-card:hover{ background:#003654; } .emmi-art .compare-label{ font-size:14px; color:#A9C6D6; font-weight:600; margin-bottom:8px; } .emmi-art .compare-value{ font-weight:800; color:#92C83E; font-size:clamp(20px,4vw,28px); line-height:1.2; margin-bottom:12px; } .emmi-art .compare-note{ font-size:14.5px; color:#FFFFFF; line-height:1.55; } @media (max-width:680px){ .emmi-art .compare-grid, .emmi-art .compare-grid.grid-3{ grid-template-columns:1fr; } } .emmi-art .value-cta{ display:flex; background:#F7F7F7; border-radius:12px; overflow:hidden; margin:24px 0 32px; } .emmi-art .value-cta-img{ flex:0 0 200px; background-size:cover; background-position:center; } .emmi-art .value-cta-body{ flex:1; padding:24px 28px; display:flex; flex-direction:column; justify-content:center; gap:12px; } .emmi-art .value-cta-body p{ margin:0; font-size:14.5px; color:#4D4D4A; line-height:1.5; } .emmi-art .value-cta-body a{ align-self:flex-start; background:#004E74; color:#FFFFFF; text-decoration:none; font-size:13.5px; font-weight:700; padding:10px 20px; border-radius:8px; } .emmi-art .value-cta-body a:hover{ background:#003654; } @media (max-width:600px){ .emmi-art .value-cta{ flex-direction:column; } .emmi-art .value-cta-img{ flex:0 0 160px; width:100%; } } .emmi-art .infografia-wrap{ margin:20px 0 28px; text-align:center; } .emmi-art .infografia-wrap img{ max-width:100%; height:auto; border-radius:12px; } .emmi-art .embed-wrap{ margin:24px 0 32px; display:flex; justify-content:center; } .emmi-art .embed-wrap iframe{ max-width:100%; border-radius:8px; } .emmi-art ul.wp-block-list, .emmi-art ol.wp-block-list{ margin:0 0 20px; padding-left:22px; } .emmi-art ul.wp-block-list li, .emmi-art ol.wp-block-list li{ margin-bottom:8px; line-height:1.55; } .emmi-art .cta-final{ background-image:linear-gradient(rgba(0,78,116,0.88), rgba(0,78,116,0.88)), url('https://emmi.mx/wp-content/uploads/2024/10/DRON-1-1.webp'); background-size:cover; background-position:center; border-radius:16px; padding:36px 32px; text-align:center; margin:24px 0 32px; } .emmi-art .cta-final img{ height:32px; margin-bottom:18px; } .emmi-art .cta-final p{ color:#FFFFFF; font-size:16px; margin:0 0 20px; max-width:480px; margin-left:auto; margin-right:auto; line-height:1.5; } .emmi-art .cta-final a{ display:inline-block; background:#92C83E; color:#004E74; font-weight:700; padding:14px 28px; border-radius:8px; text-decoration:none; font-size:15px; } .emmi-art .cta-final a:hover{ background:#206F28; } .emmi-art .social-block{ background:#F7F7F7; border-radius:12px; padding:28px 30px; margin:24px 0 32px; } .emmi-art .social-block h4{ font-size:17px; font-weight:700; color:#004E74; margin:0 0 8px; } .emmi-art .social-block p{ font-size:14.5px; color:#4D4D4A; margin:0 0 18px; max-width:520px; line-height:1.5; } .emmi-art .social-links{ display:flex; gap:10px; flex-wrap:wrap; } .emmi-art .social-links a{ display:inline-flex; align-items:center; gap:8px; background:#FFFFFF; border:1px solid #E0E0E0; border-radius:8px; padding:9px 16px; font-size:13.5px; font-weight:700; text-decoration:none; color:#004E74; } .emmi-art .social-links a:hover{ border-color:#92C83E; color:#92C83E; } .emmi-art .social-links svg{ width:16px; height:16px; fill:currentColor; flex-shrink:0; }

Esa base tarifaria tiene dos componentes que conviene distinguir:

La base regulatoria
CRE → CNE
La fijó la Comisión Reguladora de Energía (CRE) en enero de 2025. En junio de ese año, la CRE fue sustituida por la nueva Comisión Nacional de Energía (CNE) como parte de la reforma al sector energético, pero bajo el marco de transición, las disposiciones que ya había emitido la CRE se mantienen vigentes hasta que la CNE las actualice, y eso incluye esta base tarifaria.
El cargo de generación
Ajuste mensual
Se actualiza mes a mes según el costo de los combustibles y el tipo de cambio, y puede subir o bajar sin que eso modifique la base regulatoria de fondo.

Tomando en cuenta que el sector industrial representa cerca del 58% de la demanda eléctrica total del país, un ajuste de esta magnitud en ese segmento no se limita a un aumento en el recibo: se traduce en un cambio real en la estructura de costos de operación de cualquier planta con consumo eléctrico alto.

¿Por qué ocurrió este ajuste en particular?

El incremento responde a la combinación de tres factores que se presentaron en el mismo periodo:

Combustible
Gas natural más caro
Es el combustible con el que CFE genera la mayor parte de la electricidad del país, así que su alza eleva directamente el costo de producirla.
Tipo de cambio
Peso más débil
Encarece el combustible y los equipos importados que usa el sistema eléctrico, ya que ambos se cotizan en dólares.
Infraestructura
Red saturada
La red eléctrica no tiene capacidad suficiente para llevar energía desde donde se genera hasta las zonas industriales, lo que encarece el costo en las regiones más saturadas.

Esta combinación coincidió, además, con un periodo de expansión industrial acelerada impulsada por el nearshoring, lo que añadió presión adicional sobre una red que ya operaba cerca de su capacidad.

¿En qué zonas del país se sintió más el ajuste?

Las regiones con mayor impacto tarifario fueron Baja California, Chihuahua y la región de Querétaro/Edomex, entre otras zonas del noroeste y centro sur del país.

Estas mismas zonas conviven con otra problemática: una alta incidencia de microcortes eléctricos en corredores industriales. La siguiente infografía muestra un análisis de las regiones del país con mayor afectación por este fenómeno.

Zonas industriales con más microcortes en México

Ambos análisis reflejan una misma tensión estructural: el crecimiento industrial ha avanzado a un ritmo mayor que la infraestructura eléctrica del país, y esa brecha se expresa tanto en interrupciones de suministro como en el costo de la energía.

En las tres zonas donde coinciden ambos análisis, las plantas industriales enfrentan simultáneamente un riesgo operativo y un riesgo financiero que presionan el mismo renglón del estado de resultados.

¿Qué pueden hacer las empresas frente a este escenario?

Frente a un ajuste tarifario de esta magnitud, las estrategias más utilizadas por la industria combinan dos soluciones complementarias.

Autoconsumo solar
Reduce la exposición
Generar energía en sitio reduce la dependencia del suministro de CFE en la carga base de consumo de la planta. Esto no elimina el riesgo tarifario por completo, pero reduce la exposición directa al ajuste, ya que una parte del consumo deja de facturarse a la tarifa regulada.
Almacenamiento (BESS)
Continuidad operativa
Un Sistema de Almacenamiento de Energía en Baterías permite desplazar el consumo hacia los horarios de menor costo y mantener continuidad operativa ante interrupciones de suministro.

Así se ve en la práctica

Un ejemplo de esta estrategia ya en operación es el caso de Teradai México, planta del sector automotriz ubicada en Querétaro, una de las regiones señaladas anteriormente.

La planta instaló un sistema de autoconsumo solar de 275 kWp de capacidad, con más de 460 paneles solares, que genera actualmente 467 MWh al año y evita más de 200 toneladas de CO₂ anuales. Como resultado del proyecto, la planta redujo en más de 80% su tarifa energética.

La decisión de implementar este sistema formó parte de la estrategia energética general de la planta. Lo que ilustra es el tipo de resultado que puede lograrse cuando el sistema se dimensiona a partir de un diagnóstico técnico real, en una de las zonas donde el riesgo tarifario y de suministro es mayor.

Puedes ver el caso completo, con el proceso de instalación documentado en video, en nuestro perfil de LinkedIn. 👇

Profundiza más sobre el almacenamiento de energía industrial y cómo reducir costos con BESS en nuestra entrada del blog que habla sobre el tema.

Leer artículo

¿Qué pasa si tu planta no está en una de las zonas más señaladas?

El ajuste no se limitó a esas tres regiones. Las categorías GDMTH, DIST y DIT operan a nivel nacional, y el ajuste se calcula por categoría de consumo y por región, no solo por ubicación geográfica. Estar fuera de las zonas más señaladas reduce la magnitud del ajuste que recibe una planta, no la exposición al mismo.

Lo que puedes hacer ahora

  1. Revisa tu recibo de la Comisión Federal de Electricidad (CFE) e identifica en qué categoría tarifaria está tu planta (GDMTH, DIST o DIT) y cuánto ha variado tu cargo en los últimos 12 meses.
  2. Compara ese cargo contra el periodo anterior a enero de 2025 para dimensionar el impacto real del ajuste en tu operación, no solo el porcentaje general.
  3. Solicita un diagnóstico técnico que evalúe si el autoconsumo solar, el almacenamiento de energía (BESS) o ambos reducen tu exposición a la tarifa regulada.
  4. Si tu planta opera en Baja California, Chihuahua o la región de Querétaro/Edomex, considera que el riesgo es doble: mayor exposición tarifaria y mayor incidencia de microcortes, lo que hace más urgente el diagnóstico.
EMMI

Agenda una asesoría técnica personalizada con EMMI y descubre si el autoconsumo solar o un sistema BESS reducen tu exposición al ajuste tarifario.

Agenda tu asesoría aquí
]]>
Verano de mayor demanda eléctrica en México, así protege el BESS tu operación   https://emmi.mx/blog/verano-demanda-electrica-54000-mw-bess?utm_source=rss&utm_medium=rss&utm_campaign=verano-demanda-electrica-54000-mw-bess Thu, 16 Jul 2026 19:04:26 +0000 https://emmi.mx/?p=16843 En 2023 y 2024, acercarse a ese límite ya hizo que el margen de reserva operativa (el colchón de electricidad extra que el sistema guarda por si algo falla) cayera por debajo del 3%, y eso derivó en cortes de electricidad para la industria. 

54,000 MW
demanda eléctrica máxima proyectada por CENACE para el verano de 2026

¿Qué está pasando con la demanda eléctrica este verano en México? 

El director general de CENACE confirmó en un evento de la Secretaría de Energía que el pico esperado para 2026 es de 54,000 MW, por encima del récord anterior de 53,000 MW, alcanzado tanto en 2023 como en 2024. 

La siguiente tabla ilustra las consecuencias que hubo estos últimos dos años:  

2023
53,000 MW
Margen de reserva por debajo del 3%; cortes rotativos a nivel nacional.
2024
53,000 MW
2.6 millones de usuarios afectados por cortes; en Jalisco, el Consejo de Cámaras Industriales (CCIJ) reportó pérdidas de $200 a 250 millones de pesos para la industria, con casos de hasta $20 MDP en el sector alimentario.
2026 (proyectado)
54,000 MW
Apodaca, Monterrey y San Nicolás de los Garza (Nuevo León) y la Península de Yucatán ya reportaron interrupciones este verano. CENACE describe la temporada como apretada, aunque sin déficit de suministro.

Fuentes: Forbes México, INDEX, CCIJ, CIAJ, COFEPRIS.

El patrón se repite: cada vez que la demanda rompe un récord, el margen de maniobra del sistema se reduce, y en los últimos dos años eso ya se tradujo en apagones reales. La proyección de 2026 profundiza el problema y prende las alarmas en muchas empresas. 

Aquí hay una diferencia importante que explica por qué el sistema se tensa aunque México “tenga suficiente electricidad” en papel. 

La capacidad instalada es la electricidad máxima que el país podría generar si todas sus plantas trabajaran al mismo tiempo, casi 92,000 MW. Pero esa cifra es un techo teórico, no lo que realmente está disponible en el momento exacto del pico. 

La energía solar y eólica forman parte de la generación eléctrica del país. Actualmente su aporte conjunto ronda el 40% de su capacidad en el momento exacto del pico, es decir, al atardecer, cuando el sol ya se está poniendo pero la demanda de electricidad sigue alta porque el calor no ha bajado. 

Con el almacenamiento en baterías se puede resolver este desfase al guardar la energía solar generada durante el día para usarla en la noche, cuando ya no hay sol pero la red sigue exigida. 

Factor adicional en 2026: el Mundial de fútbol elevó entre 3% y 10% el consumo eléctrico en las ciudades sede (Ciudad de México, Guadalajara y Monterrey), por el uso masivo de pantallas, aire acondicionado y climatización en estadios, hoteles y centros comerciales, justo en las semanas más calurosas del año.

El riesgo mayor, según el directivo de CENACE, estuvo en la confiabilidad del suministro de gas natural en el sureste del país, más que en la capacidad instalada. 

La Península de Yucatán fue la zona que más preocupó a CENACE (el operador del Sistema Eléctrico Nacional), tanto que se instalaron 150 MW de plantas de emergencia portátiles en la región para pasar la temporada. 

¿Por qué esto eleva el riesgo de microcortes para la industria? 

Para una planta con demanda superior a 100 kW en media tensión, la factura eléctrica se rige por la tarifa Gran Demanda en Media Tensión Horaria (GDMTH). Esta tarifa no solo cobra la energía consumida en kWh, también penaliza el cargo por demanda máxima, calculado sobre el pico más alto registrado en intervalos de 15 minutos. 

En otras palabras: si tu planta consume poca electricidad casi todo el mes pero un día arrancan varias máquinas al mismo tiempo, ese momento de 15 minutos de consumo alto puede definir buena parte de la factura completa, aunque el resto del periodo hayas operado de forma eficiente. 

00:0006:0012:0018:0020:0022:0024:00
Horario punta: 20:00 a 22:00 horas, el tramo más caro de la tarifa y el de mayor estrés de la red.

La industria consume más durante la jornada laboral, entre las 6:00 y las 20:00. El pico de las 20:00 a las 22:00 lo genera principalmente el consumo residencial, cuando la gente llega a casa y usa luces, aire acondicionado y electrodomésticos. 

Pero la tarifa GDMTH no mide el momento de mayor actividad de tu planta, mide específicamente lo que consumes durante esas dos horas de la noche. Turnos nocturnos, refrigeración, servidores o procesos continuos que sigan operando ahí se cobran al precio más alto, y pueden definir buena parte de tu factura aunque no sea tu momento de mayor consumo del día. 

Las tarifas ya subieron: los ajustes recientes en la región peninsular llegaron a 5.45% en horario base y 5.55% en horario punta, con un incremento promedio nacional cercano al 5.35%. 

El costo tarifario es solo una parte del riesgo. Cuando la red opera al límite, la probabilidad de microcortes y variaciones de voltaje aumenta, y para un proceso productivo eso significa líneas detenidas, equipo sensible dañado y materia prima perdida, sin previo aviso. 

¿Qué sectores tienen menos margen para resistir un pico sin respaldo? 

El nivel de riesgo depende del tipo de proceso industrial en cada planta.  

Los procesos continuos son los que menos margen tienen para absorber un corte eléctrico, y varios sectores ya lo han documentado en veranos recientes: 

Manufactura y automotriz
Hasta 200 MDD por hora, a nivel nacional

Un microcorte activa paros de emergencia en los controladores que manejan las líneas automatizadas, y reiniciarlas puede tardar horas.

En corredores de nearshoring (Nuevo León, Querétaro, el Bajío, Chihuahua) un corte genera además multas por retrasos en la entrega.

Alimentos y bebidas
$20 MDP en pérdidas individuales, Jalisco 2024

Si una pasteurizadora se detiene a la mitad del proceso, el lote no se puede retomar donde quedó.

Si una cámara frigorífica pierde potencia, el inventario empieza a deteriorarse desde el primer minuto sin luz.

Química y plásticos
Pérdida total de la materia prima en proceso

En extrusoras e inyectoras, el material se solidifica durante el corte.

El equipo queda inutilizado hasta que se limpia a mano, lo que suma horas de paro además del material perdido.

Farmacéutica
Riesgo de invalidar el lote completo

Un corte durante la liofilización o la fermentación puede arruinar un lote que tardó semanas en producirse.

COFEPRIS y estándares como la FDA y la EMA exigen documentar cualquier desviación de temperatura.

Fuentes: Index, Forbes México, CCIJ, CIAJ, COFEPRIS.

¿Cómo protege el BESS la continuidad operativa? 

Un Sistema de Almacenamiento de Energía en Baterías (BESS), por sus siglas en inglés, atiende dos frentes al mismo tiempo: 

Frente financiero

Carga energía en horarios de menor costo y la descarga en horario punta, reduciendo el cargo por demanda máxima. Retornos de inversión de 3 a 4 años según el perfil de consumo.

Frente operativo

Ante un corte o caída de tensión, responde en milisegundos, sin la latencia ni la logística de combustible de un generador diésel. La planta sigue operando mientras la red resuelve la contingencia.

El marco regulatorio también empuja en esta dirección. Desde marzo de 2025, el Acuerdo A/113/2024 de la Comisión Reguladora de Energía (CRE) exige que todo nuevo proyecto de generación renovable incluya almacenamiento equivalente a por lo menos el 30% de su capacidad, con un mínimo de 3 horas de autonomía. 

El siguiente esquema resume la situación que enfrenta tu planta este verano y cómo el BESS la resuelve: el pico de 54,000 MW y su efecto en tu tarifa, frente a lo que cambia cuando tu planta cuenta con este sistema.

De un verano al límite a una planta que no depende de él

Situación
MW
Pico de 54,000 MW en el Sistema Eléctrico Nacional, el mismo nivel que en 2023 y 2024 ya hizo caer el margen de reserva por debajo del 3%
$
Sube el riesgo de un pico caro y de un microcorte, porque el cargo por demanda máxima de la tarifa GDMTH se calcula justo en ese horario punta
Solución
⚡
El BESS carga en horario base y descarga en horario punta, y responde en milisegundos si ocurre una falla en la red
✓
Tu producción sigue corriendo, con factura más predecible y continuidad operativa, aunque la red esté al límite

En EMMI creemos que la energía debe ser una ventaja para tu negocio, no un riesgo que dependa del clima o de un récord de demanda. Integramos autoconsumo solar y BESS bajo un mismo proyecto de ingeniería, procura y construcción (EPC), con personal propio y sin subcontratación, para que tu planta esté lista antes de que llegue el próximo pico de calor. 

Profundiza más sobre el almacenamiento de energía industrial y cómo reducir costos con BESS en nuestra entrada del blog que habla sobre el tema.

Leer artículo

Lo que puedes hacer ahora

  1. Revisa tu recibo de la Comisión Federal de Electricidad (CFE) y ubica cuánto representa el cargo por demanda máxima en tu tarifa. 
  1. Identifica si tu planta tuvo microcortes o variaciones de voltaje en los últimos dos veranos. 
  1. Solicita un diagnóstico técnico que mida tu perfil real de consumo antes del pico de calor. 
  1. Evalúa si tu proceso puede tolerar una interrupción de minutos sin pérdida de producto o daño a equipo. 

Preguntas frecuentes 

¿Un sistema BESS funciona para evitar apagones en época de alta demanda?

Sí. El BESS responde en milisegundos ante cualquier falla o corte de la red, antes de que los equipos sensibles registren la caída de tensión.

¿Cuánto tiempo tarda la instalación de un sistema BESS?

Con EMMI, el proyecto completo (autoconsumo solar más almacenamiento) se ejecuta en un promedio de 40 días, con stock propio y sin demoras por desabasto.

¿Puedo financiar el sistema sin poner capital propio?

Sí, existen dos modalidades: la compra directa del sistema (CAPEX), con beneficio fiscal de depreciación acelerada, o un contrato de compra de energía a precio fijo (PPA), sin inversión inicial y con el mismo precio de energía durante el plazo del contrato.

¿Qué mantenimiento requiere el sistema?

EMMI da monitoreo y mantenimiento preventivo y correctivo 24/7 con personal propio, sin depender de terceros para que el sistema siga operando al máximo.

EMMI

Agenda una asesoría técnica personalizada con EMMI y descubre si un sistema BESS es viable para tu operación.

Agenda tu asesoría aquí
]]>
Energía Solar en México: El momento de consolidar infraestructura, regulación y almacenamiento  https://emmi.mx/blog/energia-solar-en-mexico-el-momento-de-consolidar-infraestructura-regulacion-y-almacenamiento?utm_source=rss&utm_medium=rss&utm_campaign=energia-solar-en-mexico-el-momento-de-consolidar-infraestructura-regulacion-y-almacenamiento Wed, 11 Mar 2026 16:07:08 +0000 https://emmi.mx/?p=15672 Un nuevo capítulo para la energía solar en México

México atraviesa un punto de inflexión en su sector energético. Después de años de incertidumbre regulatoria y rezago en infraestructura, el gobierno actual recientemente ha anunciado uno de los programas de inversión en generación y transmisión eléctrica más ambiciosos de las últimas décadas. 

Para el sector industrial, que ya enfrenta saturación en la red eléctrica y un aumento en la demanda impulsada por el nearshoring, este nuevo ciclo es una variable estratégica para la continuidad operativa y la competitividad empresarial. 

En este contexto, Ángel Nicolás, CEO de EMMI, compartió en el artículo Spending big on Mexican Solar publicado por PV Magazine Global en su edición de marzo, su visión sobre el momento que vive el sector energético en México y la importancia de coordinar esfuerzos entre industria, gobierno e infraestructura eléctrica para acelerar la transición energética.

«La planeación coordinada entre generación, transmisión, distribución y almacenamiento será clave para asegurar que estas soluciones se implementen de forma eficiente y alineadas con las necesidades reales del sistema.», aseguró Nicolás. 

La capacidad solar instalada en México alcanzó aproximadamente 12 GW a finales de 2024 (IRENA, 2025) y el mercado podría escalar hasta 30.84 GW hacia 2031 a una tasa de crecimiento anual del 14.12% (Mordor Intelligence, enero 2026). Sin embargo, el camino hacia ese potencial exige entender cinco claves que hoy determinan el ritmo y la viabilidad de los proyectos. 

1. El plan de inversión del gobierno: señales positivas y retos pendientes

De acuerdo con el artículo de PV Magazine, en diciembre de 2025, la Secretaría de Energía autorizó en tiempo récord 20 proyectos privados de generación renovable: 15 plantas solares (2,471 MW) y 5 parques eólicos (849 MW), con 1,488 MW de almacenamiento asociado y una inversión total que supera los USD 4,752 millones. Los tiempos de permiso se redujeron de entre 8 y 18 meses a un promedio de dos meses (SENER, diciembre 2025). Adicionalmente, el gobierno comprometió una inversión pública de MXN 5.6 billones en infraestructura general hasta 2030, con el 54% orientado al sector energético.

Para Ángel Nicolás, consolidar el impacto de estos proyectos requiere avanzar en certidumbre regulatoria para la inversión de largo plazo. El desarrollo de infraestructura energética implica horizontes de planeación de varias décadas, por lo que contar con reglas claras en materia de permisos, interconexión y operación del mercado resulta fundamental para sostener la participación de capital privado y garantizar continuidad en los proyectos. La estabilidad del marco regulatorio también permite que las empresas planifiquen inversiones con mayor previsibilidad y aceleren la ejecución de nueva capacidad de generación.

De forma paralela, señala la necesidad de fortalecer la infraestructura de transmisión y distribución, así como avanzar en la integración del almacenamiento energético. El crecimiento de la generación renovable demanda redes eléctricas con mayor capacidad y flexibilidad para transportar la energía hacia las zonas donde se concentra la demanda eléctrica, especialmente industriales. Al mismo tiempo, el almacenamiento se vuelve un componente estratégico para gestionar la variabilidad de las fuentes renovables, optimizar el uso de la red y mejorar la estabilidad del sistema eléctrico. 

2. Autoconsumo Solar: el motor que ya está funcionando

Mientras los proyectos Utility-Scale capturan los titulares, el Autoconsumo Solar ha sido un motor del crecimiento reciente. La alta demanda entre usuarios industriales ha impulsado una expansión acelerada de proyectos fotovoltaicos que se benefician de las recientes disposiciones gubernamentales orientadas a facilitar la interconexión.

Se proyecta que para 2026,  el mercado solar total de México alcance 15.94 GW instalados. Para el sector industrial, el Autoconsumo Solar ofrece estabilización de costos energéticos, reducción de exposición a variaciones tarifarias y mayor resiliencia operativa ante una red eléctrica que ya opera cerca de su límite de capacidad en varias regiones del país.

3. El Almacenamiento BESS: la pieza que hace confiable la transición

El almacenamiento de energía (BESS) ha pasado de ser un elemento complementario en los sistemas fotovoltaicos a convertirse en un componente estratégico indispensable. Los proyectos aprobados en diciembre incluyen obligatoriamente sistemas BESS, y los proyectos CFE en Carbón II y Río Escondido contemplan almacenamiento equivalente al 30% de su capacidad por tres horas (Strategic Energy Europe, diciembre 2025). También, el Parque Fotovoltaico Puerto Peñasco, en el cual EMMI llevó a cabo la construcción de 100 MW, se proyecta que alcanzará 1,000 MW y 190 MW de Almacenamiento en Baterías.

Para que los sistemas BESS escalen en México, Ángel Nicolás identifica tres necesidades urgentes:

  • Marcos regulatorios claros que definan cómo los sistemas de almacenamiento se conectan, operan y son remunerados en la red.
  • Incentivos y esquemas financieros que hagan viables las inversiones en BESS a nivel industrial y comercial.
  • Planeación coordinada entre generación, transmisión, distribución y almacenamiento para garantizar implementación eficiente.

Desde la perspectiva industrial, los BESS permiten amortiguar variaciones de tensión, cubrir microcortes, optimizar la curva de consumo y reducir picos de demanda, elementos críticos en sectores con procesos automatizados de alta sensibilidad.

Sistema de autoconsumo solar en instalación industrial con paneles fotovoltaicos en el techo y sistema de almacenamiento BESS para optimizar el uso de energía y la transición energética.

4. La red eléctrica: el cuello de botella que define el ritmo del sector

La capacidad de transmisión y distribución es hoy el principal limitante para que la nueva generación solar llegue a donde se necesita. CFE tiene control sobre la transmisión y distribución, pero enfrenta una tarea que difícilmente puede sostener para abastecer la demanda energética que el país requiere.

El gobierno ha comprometido 66 proyectos de transmisión entre 2025 y 2026, con una inversión de 35.84 mil millones de pesos y el plan del gobierno contempla 7,500 millones de dólares específicamente para nuevas líneas de transmisión dentro del programa de inversión. Sin embargo, los desarrolladores industriales ya están financiando ramales privados de conexión, dadas las necesidades energéticas de crecimiento.

En regiones industriales claves como Nuevo León, Coahuila y Guanajuato, el margen de reserva cayó hasta el 6%, muy por debajo del umbral de confiabilidad del 15-20%, poniendo en evidencia que años de subinversión en transmisión dejaron al sistema vulnerable a cortes y apagones que afectaron la continuidad operativa. 

5. El entorno comercial: integración regional nearshoring y oportunidades estratégicas

El contexto comercial en América del Norte también influye en la evolución del mercado fotovoltaico mexicano. Las dinámicas de comercio internacional y los ajustes en las cadenas de suministro están generando cambios en los costos, la disponibilidad de tecnología y las estrategias de abastecimiento para nuevos proyectos energéticos en la región. 

En este escenario, México mantiene una posición estratégica dentro del ecosistema energético. La cercanía geográfica, la profundidad de los vínculos comerciales con Estados Unidos y la integración productiva regional abren oportunidades para fortalecer la participación del país en la cadena de valor solar, particularmente en actividades de ensamble, manufactura y desarrollo tecnológico. 

Ante este panorama, Ángel Nicolás, considera que el desarrollo del sector debe apoyarse en una estrategia de colaboración industrial y fortalecimiento de capacidades del sistema. Este enfoque permite consolidar una cadena de valor más robusta para la energía solar en el país y posicionar a México como un actor relevante dentro del desarrollo energético regional. 

De la incertidumbre a la acción: lo que esto significa para la industria

El mercado solar mexicano apunta a un crecimiento robusto. El gobierno ha enviado señales de compromiso con una meta de 45% de energía limpia para 2030 (frente al 22-23% actual). Estos objetivos requieren acelerar drásticamente la incorporación de proyectos renovables y eliminar las limitaciones regulatorias hacia el sector industrial.

Para las empresas, este ciclo de inversión abre ventanas concretas:

  • Implementación de proyectos de Autoconsumo Solar con retornos de inversión de 3 a 4 años y reducción de hasta 95% en la factura energética.
  • Integración de sistemas de almacenamiento BESS para garantizar continuidad operativa, optimizar consumo y reducir picos de demanda.
  • Adquisición de PPAs corporativos como mecanismo para acceder a energía renovable sin inmovilizar capital propio, con plazos de hasta 25 años.
  • Fortalecimiento de perfil ESG que amplía acceso a financiamiento preferencial, en un mercado donde el 40% de la deuda de largo plazo en México ya incorpora criterios de sostenibilidad.

Con más de 11 años de experiencia, EMMI ha contribuido a la transición energética de México y Latinoamérica con el desarrollo de infraestructura sustentable y proyectos renovables para industrias, empresas y comunidades con enfoque en proyectos Utility-Scale y de Autoconsumo Solar.

Gráfico del crecimiento de la capacidad solar instalada en México de 2025 a 2031, mostrando el aumento proyectado del mercado fotovoltaico y la expansión del autoconsumo energético.

Conclusión: El momento de actuar es ahora

En 2026, la diferencia entre las empresas que lideran la transición energética y aquellas que reaccionan tarde radica en su capacidad para anticipar cambios y tomar decisiones estratégicas a tiempo. 

México se encuentra en una nueva etapa de desarrollo del sector eléctrico, marcada por anuncios de inversión en infraestructura, una creciente demanda energética y el avance de tecnologías como el almacenamiento. Sin embargo, los retos estructurales, como la saturación de la red de transmisión, la necesidad de marcos regulatorios claros para el almacenamiento y los desafíos en la cadena de suministro, continúan siendo factores clave en la planeación energética de las empresas.

En este contexto, la energía solar se consolida como un pilar estratégico para la industria, no solo por su impacto ambiental, sino por su capacidad para fortalecer la resiliencia operativa y la competitividad empresarial.

¿Su organización está lista para actuar ante este nuevo ciclo de inversión energética en México?

]]>